SUBSCRIBE NEWS LETTER

rpo

SECI Issues NITs For 1250 MW of Solar Projects in Rajasthan and Tamil Nadu

The 1250 MW tendered capacity will be developed in the states of Rajasthan (750 MW) and Tamil Nadu (500 MW). The Solar Energy Corporation of India (SECI) has issued two Notice Inviting Tenders (NITs), inviting bids for the development of solar projects of 1250 MW capacity in Rajasthan and Tamil Nadu. The first NIT has been […]

Read more

Siemens Gamesa to Supply 21 MW Wind Turbines in First Deal With SPIC China

Siemens Gamesa has secured its first landing of SG 3.X platform in China, supplying six units of its SG 3.4-132 wind turbines with a flexible power rating of 3.65 MW. Siemens Gamesa Renewable Energy (SGRE) reached an agreement to supply six SG 3.4-132 wind turbines with a flexible power rating of 3.65 MW to a […]

Read more

Cabinet Briefed on MoU Between India and Tajikistan For RE Cooperation

The Cabinet was apprised of an MoU between India and Tajikistan on cooperation in the field of Renewable Energy. The Union Cabinet chaired by Prime Minister Narendra Modi was apprised of the Memorandum of Understanding between India and Tajikistan on Cooperation in the field of Renewable Energy. The MoU was signed on October 8, 2018. […]

Read more

SECI Issues RfS For 97.5 MW Rooftop Solar Scheme For Govt Buildings

The ceiling tariff for general category states and union territories and for special category states and Islands is Rs 3.50/kWh. The Solar Energy Corporation of India (SECI) has issued the Request for Selection Document (RfS) for the implementation of the 97.5 MW of grid-connected rooftop solar PV projects for government buildings in different states and […]

Read more

Cabinet Approves Second Phase of FAME Scheme with Outlay of Rs 10,000 Cr

The Union cabinet has approved the second phase of the FAME scheme with an incentive layout of Rs 10,000 crores. The Union Cabinet chaired by Prime Minister Narendra Modi has approved the proposal for the implementation of the Rs 10,000-crore Faster Adoption and Manufacturing of Electric Vehicles in India Phase II (FAME-II) scheme for promotion […]

Read more

NIT For 14 MW Solar Plant With 42 MWh BESS at Leh and Kargil

The project shall be implemented in Developer Mode with a fixed tariff of Rs 2 per unit with Viability Gap Funding (VGF) support. The Solar Energy Corporation of India (SECI) has issued a Notice Inviting Tenders (NIT) for online bids to develop 14 MW of solar PV power plant with linked 42 MWh of Battery […]

Read more

SECI Seeking Owners Engineer For Andhra Pradesh Hybrid Project

The last date of submission of the EoI is March 25, 2019. The Solar Energy Corporation of India (SECI) has issued an Expression of Interest (EOI) for the selection of owners engineer for the 160 MW solar-wind hybrid power plant with Battery Energy Storage System (BESS) at Ramagiri, Anantapur District, Andhra Pradesh. The selection of […]

Read more

NIT For 1200 MW Wind-Solar Hybrid Projects Tranche-II

SBE Renewable and Mahoba Solar Private Limited were awarded a total 840 MW capacity of the tendered 1200 MW capacity of the Tranche-I tender. The Solar Energy Corporation of India (SECI) has issued a Notice Inviting Tenders (NIT) inviting online bids for setting up of 1200 MW ISTS-Connected Wind-Solar Hybrid Power Projects (Tranche-II) on a […]

Read more
      SUBSCRIBE NEWS LETTER
Scroll