UPPCL Invites Bids for 10 MW/40MWh Standalone BESS in Mathura Updated On Fri, Oct 28th, 2022 by Saurenergy Uttar Pradesh Power Corporation Ltd. (UPPCL) has invited bids for the setting up of a project of a 10MW / 40MWh standalone battery energy storage system in Uttar Pradesh at Vrindavan, Mathura. The last date for submitting the bid for this 10MW / 40MWh standalone battery energy storage system project is December 26, 2022, & […] Read more
GUVNL Invites RFS for 500 MW Solar Projects with Greenshoe Option Updated On Fri, Oct 28th, 2022 by Saurenergy Gujarat Urja Vikas Nigam (GUVNL) has floated a request for selection to purchase power through a competitive bidding process from 500 MW grid-connected solar PV power projects to be set up anywhere in India. There is a greenshoe option with an additional capacity of 500 MW (RFS for 500 MW). The last date for submitting […] Read more
Project Engineering Manager – HVDC Updated On Thu, Oct 27th, 2022 by Saurenergy Responsibilities:- Integration – Responsible for integration, i.e. coordination across all engineering functions, including integrated change management control, i.e. making sure that up-dates to the contract conditions are reflected cross-functionally between disciplines. The PEM ensures that introduced changes are well-motivated, tracked and logged properly. The PEM is responsible to develop and maintain the PEMP. Scope Management […] Read more
Project Lead Engineer – Power System Updated On Thu, Oct 27th, 2022 by Saurenergy Responsibilities:- Technical contribution Engineering Development: As a technical lead for all engineering disciplines – evaluates, selects and applies standard techniques, procedures and criteria to perform task or sequence of tasks, for conventional projects with few complex features. Executes assignments using established solutions. Authorization: May act as a design authority for a particular engineering discipline and […] Read more
NTPC Vidyut Vyapar Nigam Calls for Bids for 21-MW Solar Power Projects Updated On Thu, Oct 27th, 2022 by Saurenergy NTPC owned subsidiary NTPC Vidyut Vyapar Nigam (NVVN) has called for bids for the development of two solar power projects each having a capacity of 10.5 MW in Neemuch, Madhya Pradesh. As per the tender document released by the state owned power generator, Bhopal Municipal Corporation will provide the land for the solar power plants. […] Read more
Piping Lead Engineer – III SBG Updated On Thu, Oct 27th, 2022 by Saurenergy Design and Detail Engineering of Industrial Water Piping Systems with exposure to various codes and standards like ASME, IS, AWWA, IWWA, ASME, ANSI, BS, HIS, CPHEEO Manual, ISO, DIN etc. Preparation and Checking of Piping Layouts for Water Treatment Plants (WTP) Preparation and Checking of G.A drawings, Piping Layouts, Isometric Drawings, Design Basis Report (DBR) […] Read more
Site QA/QC Engineer – E&I Updated On Thu, Oct 27th, 2022 by Saurenergy Preparation & Implementation Method statements, Procedures & ITPs pertaining to E&I works inline with Contract specification. E&I Sub-contractor workmen evaluation, induction & performance monitoring. Coordinate with client for QA/QC submittal approval, day-today inspections, audits, observation closure & final system clearance etc. Handle a team of E&I field QA/QC inspectors, monitor & mentor them periodically. Perform […] Read more
Tata Power Solar Launches Off-Grid Solar Solutions in WB, Bihar, Jharkhand Updated On Thu, Oct 27th, 2022 by Saurenergy Tata Power Solar Systems has shared that it will launch cost-efficient solar off-grid solutions in the states of West Bengal, Bihar and Jharkhand. Tata Power Solar Systems Ltd (TPSSL), is a wholly-owned subsidiary of Tata Power Renewable Energy Ltd (TPREL), manufactures solar modules, solar cells, and other solar products. It also provides EPC services for […] Read more
Germany’s ib vogt Completes 116 MWp Coara Marang Solar Project in Malaysia Updated On Thu, Oct 27th, 2022 by Saurenergy The developer of large-scale turnkey PV plants worldwide, ib vogt has achieved commercial operation (COD) of the 116 MWp Coara Marang Solar Project, in consortium with its Malaysian joint venture partner, Coara Solar Sdn Bhd. COD was reached on September 17, 2022, providing clean solar energy from the photovoltaic plant to the Malaysian electricity grid. […] Read more