Norfund Pumps Repeat Investment into Fourth Partner Energy for ₹350 Cr Updated On Fri, Aug 11th, 2023 by Saurenergy Norwegian Investment Fund for developing countries – Norfund today announced a fresh investment of ₹350 Cr into renewable energy solutions platform, Fourth Partner Energy (4PEL). This is the second round of equity infusion by Norfund into 4PEL, following its $100 Mn investment in June 2021. Speaking about this development, Anders Blom, Vice President at Norfund […] Read more
SECI Projects Account For 18% of India’s Solar Capacity: Govt Updated On Fri, Aug 11th, 2023 by Saurenergy The Ministry of New and Renewable Energy (MNRE) claimed that 18.3 percent of India’s total solar energy capacity was contributed by the Solar Energy Corporation of India (SECI). The information was given by the Union New and Renewable Energy Minister RK Singh in his written reply before the Lok Sabha. The minister said that in […] Read more
EaseMyTrip, Blusmart Partners To Boost Electric Mobility Updated On Fri, Aug 11th, 2023 by Saurenergy Online travel tech platform EaseMyTrip has now announced its partnership with Blusmart for increased electric mobility in the country. As per the mandate, EaseMyTrip will now offer an environment-friendly fleet in an existing lineup of cabs with this partnership. The endeavor aims to provide sustainable travel solutions for all EaseMyTrip customers and move towards the […] Read more
First Solar Continues US Footprint with Announcement of New Factory in Louisiana Updated On Fri, Aug 11th, 2023 by Saurenergy Solar solutions provider First Solar will be setting up is fifth thin-film solar module factory in the Acadiana Regional Airport in Iberia Parish, Louisiana in the USA. The unit will see an investment worth $1.1bn and aid America with capacity expansion for the production of photovoltaic solar modules domestically. The said investment will chalk out […] Read more
SJVN Invites Bids for BOS Package of 75 MW Solar Project Updated On Fri, Aug 11th, 2023 by Saurenergy SGEL (SJVN Green Energy Limited), a subsidiary of SJVN, has issued a tender for the BOS package for a 75 MW (AC) grid-connected solar PV power plant at Jamui in Bihar. The last day to submit bids is August 31, 2023. Bids open on August 31, 2023. The scope of work entails design, engineering, supply, […] Read more
Assistant Lead Engineer – NPD Design Updated On Thu, Aug 10th, 2023 by Saurenergy Responsibilities:- Design special tools & Processes for Transport/installation/service of Powertrain Collect requirements, design, verification, maintenance and operation of TCM solutions Manage full design lifecycle from requirements to serial implementation – with safety and quality, on time and on cost targets Design tools and perform structural analysis based on Eurocode Validate the solution on field Perform […] Read more
Project Planner – Electrical Updated On Thu, Aug 10th, 2023 by Saurenergy The Control Hardware Project Management consist of a group of highly experienced and diverse Project Managers and Planners who work across Platform, technology and legacy portfolio. The department is part of the Control Hardware organization which are delivering the turbine Hardware infrastructure including Electronics, Cables, Sensors, Panels and Power supplies. We have a high focus […] Read more
BluPine Wins 100 MW & ACME Bags 500 MW in RUVNL Tender Updated On Thu, Aug 10th, 2023 by Saurenergy Rajasthan Urja Vikas Nigam Limited’s (RUVNL’s) tender for the development of 1200 MW of solar with storage projects has declared BluPine Energy and ACME as winners. While BluPine bagged a quantity of 100 MW at INR 6.68/Kwh, ACME won 500 MW out of the quoted 600 MW at INR 6.69/kWh. The auction was held in […] Read more
Govt Amends Bidding Norms For HVDC Projects Under ISTS Updated On Thu, Aug 10th, 2023 by Saurenergy The Ministry of Power has now issued an order amending its Standard Bidding Document for the procurement of Inter-State Transmission System (ISTS) power through tariff-based competitive bidding (TBCB) process under the High Voltage Direct Current (HVDC) transmission system. The new order proposed modifying para 2.1.2 to make changes to the eligibility criteria of the bidders. The ministry […] Read more