India Sets Sight for 450 GW RE Capacity by 2030: President Kovind Updated On Fri, Jan 31st, 2020 by Saurenergy India has embarked on an ambitious target of having 450 GW of renewable energy by 2030 to capitalise on its clean resources, President Ram Nath Kovind said India has embarked on an ambitious target of having 450 GW of renewable energy by 2030 and also provide 17 lakh solar pumps to farmers under Pradhan Mantri-Kusum […] Read more
Economic Survey 2019-20. Opportunity Ignored? Updated On Fri, Jan 31st, 2020 by Saurenergy The Economic Survey for 2019-20 was presented by Finance Minister Nirmala Sitharaman today in parliament. The survey, which is taken as a useful indicator of government intent, though not always ability to take action, is notable for what it talks about, and perhaps worryingly, what it ignores. Thus, in a survey where there seems to […] Read more
Tenders Issued for Solar Plants for Agro-PV-Concept at NISE Gurugram Updated On Fri, Jan 31st, 2020 by Saurenergy NISE has issued a tender for the commissioning of the 30 kWp solar PV power plant at the NISE Campus in Gurugram. The National Institute of Solar Energy (NISE) has issued a tender, inviting bids from original manufacturers of solar PV modules, for the commissioning of the 30 kWp solar photovoltaic (SPV) power plant at […] Read more
BHEL Tenders for O&M of 1.7 MW Solar Plant in MP Updated On Fri, Jan 31st, 2020 by Saurenergy BHEL has issued a tender for undertaking the O&M of a 1.7 MW solar power plant in Bina, Madhya Pradesh. Bharat Heavy Electricals Limited (BHEL) has issued a tender, inviting bids from eligible vendors for undertaking the operation and maintenance (O&M) of a 1.7 MW solar power plant in Bina, Madhya Pradesh. The scope of […] Read more
The Red Tape Challenge. How RE Producers in India Are Squeezed Updated On Fri, Jan 31st, 2020 by Saurenergy While meeting people within and outside the renewables industry, almost everyone agrees that unlike other sectors, a key part of the work, namely, the actual build up of renewable projects, in terms of procurement, transportation and commissioning at site, is probably the easiest part of the job.In fact, the mismatch between the time taken to […] Read more
Tender for 5 MW Solar Plant on RESCO Model Issued in Noida Updated On Thu, Jan 30th, 2020 by Saurenergy The New Okhla Industrial Development Authority has issued a tender for the commissioning of 5 MW solar PV plant on the RESCO model in Noida The New Okhla Industrial Development Authority (NOIDA) has issued a tender for the commissioning of a 5 MW grid-connected solar PV plant under the RESCO model at identified buildings/ spaces […] Read more
Yellow Door Energy Signs two Agreements With Saudi Arabia’s APICORP Updated On Thu, Jan 30th, 2020 by Saurenergy Yellow Door Energy will install solar panels at APICORP’s headquarters in Dammam and retrofit the building with energy-efficient technologies. In line with its commitment to promote long-term sustainability and green initiatives, the Arab Petroleum Investments Corporation (APICORP), a multilateral development financial institution, have announced that it signed two agreements with Yellow Door Energy (YDE), a […] Read more
As Cancellations Surge, India’s Solar ‘Pipeline’ Drying Up Updated On Thu, Jan 30th, 2020 by Saurenergy News from the much celebrated 2 GW auction of NTPC in 2018, where top developers had bid for prices as low as Rs 2.59 is not good. 70 percent of the capacity won by developers, namely, Acme Solar, Shapoorji Pallonji, and Azure Power, have opted out of the deal, citing regulatory delays. The option of […] Read more
EDF Renewables and SITAC Commission 105 MW Wind Plant in India Updated On Thu, Jan 30th, 2020 by Saurenergy EDF Renewables and its India operations partner the SITAC Group have announced the commissioning of the 105 MW Verdant wind project in India. EDF Renewables and its partner for wind power generation in India, the SITAC Group, have announced the commissioning of the Verdant project, a new wind farm of 105 MW installed capacity in […] Read more