“This fiscal we aspire to achieve 100 billion units in terms of volume”, says Rohit Bajaj, IEX Updated On Mon, Feb 28th, 2022 by Saurenergy Trading in India’s Green Day Ahead Market, ever since it started in October’21, and before that the Green Term ahead market (started in August 2020) has been on a growth path, hitting a high of 280 million units (MU) in January this year. Energy trading accounts for just 6% of the overall power market, with […] Read more
SJVN to Develop 400 MW Solar Park in Himachal Pradesh’s Kinnaur Updated On Mon, Feb 28th, 2022 by Saurenergy Satluj Jal Vidyut Nigam (SJVN) has been allotted the development of 400 MW Solar Park in Upper Kinnaur, Himachal Pradesh. The Ministry of New & Renewable Energy (MNRE) has accorded in-principle approval for the development of this solar park under Mode-8 or Ultra Mega Renewable Energy Power Parks of its Solar Park Scheme. SJVN’s Chairman & […] Read more
SJVN Bags 15 MW floating solar project in Himachal Updated On Sun, Feb 27th, 2022 by Saurenergy Nand Lal Sharma, Chairman & Managing Director, SJVN has announced the winning of a 15 MW Grid Connected Floating Solar PV Power Project at Nangal pond, near village Neilla, District Bilaspur, Himachal Pradesh. SJVN has bagged the full quoted capacity of 15 MW @ INR 3.26 /Unit on Build Own and Operate basis through e-Reverse […] Read more
Subsea Senior Tech Updated On Fri, Feb 25th, 2022 by Saurenergy Responsible for operating Remotely Operated Vehicles, Subsea Tooling, IWOCS and RWOCS Systems, Tensioning and Reel Systems in a safe and efficient manner, and maintaining and repairing all electronic, electrical, mechanical, and hydraulic systems and sub-systems associated with same including component repair, replacement and troubleshooting. Duties & Responsibilities:- Functions:- To assist the System Supervisor and […] Read more
Telangana Issues Empanelment Tender for 50MW Rooftop Solar Projects Updated On Fri, Feb 25th, 2022 by Saurenergy The Telangana State Renewable Energy Development Corporation (TSREDCO) has floated a new tender, inviting bids for empaneling vendors to develop 50 MW of grid-connected residential rooftop solar projects. The rooftop projects will be executed as part of the second phase of the Grid Connected Rooftop Solar Program that comes under the Ministry of New and Renewable […] Read more
Senior Electrical Engineer – Product Design Updated On Thu, Feb 24th, 2022 by Saurenergy Responsibilities:- Develop electrical design of Fluence battery system products from conceptual stage to final design, testing, and manufacturing while meeting difficult requirements for size, environmental conditions, maintainability, reliability, long lifetime, and cost. Define design, construction, operation and maintenance goals for products. Acquire in-depth knowledge of industry standards related to safe battery storage system design, including […] Read more
Icra Predicts Strong Demand for Domestic Solar OEMs with Policy Support Updated On Tue, Feb 22nd, 2022 by Saurenergy Business prospects of domestic solar original equipment manufacturers (OEMs) will remain strong aided by several policy measures over medium-term, rating agency Icra said. As a result, many domestic OEMs have announced sizeable capital expenditure to augment the cell and module capacity, including the capex for integrated facilities under PLI scheme by the winning bidders. However, […] Read more
Azure picks Ecoppia for hybrid project of 400MW Updated On Tue, Feb 22nd, 2022 by Saurenergy Israeli based Ecoppia, a world leader in robotic cleaning solutions for photovoltaic solar, has announced a significant milestone in India, with the firm signing a ‘first ever’ hybrid project of 400MW with renewable developer Azure Power. This complex project, combined of two types of installations – fixed tilt and Single Axis Trackers (SAT), along with […] Read more
MNRE Minister confirms fresh bids to be called for expanded Solar PLI Scheme Updated On Sun, Feb 20th, 2022 by Saurenergy Union minister for Power and Renewable Energy RK Singh has said that the fresh bids will be invited for the setting up of 40,000 MW production capacity for solar modules and cells under the production-linked incentive (PLI) scheme. Finance Minister Nirmala Sitharaman had made an additional outlay of Rs 19,500 crore for the PLI scheme […] Read more