CERC Allows Fortum Subsidiary To Retain Connectivity For 300 MW Karnataka Project Updated On Thu, Apr 25th, 2024 by Saurenergy In an interesting order earlier this week, the Central Electricity Regulatory Commission allowed SolarOne Energy Private Limited, a subsidiary of Finnish major Fortum, to retain 300 MW connectivity it had been allotted from the Central Transmission Utility of India Limited (CTUIL). The issue arose after CTUIL moved to cancel connectivity citing failure to sign PPA […] Read more
Green Stocks-Shakti Pumps Pauses, Waaree Continues To Move Updated On Wed, Apr 24th, 2024 by Saurenergy After the astounding move yesterday, when all the green energy pack stocks moved up, it was a day to consolidate today, with Shakti Pumps taking a pause. Inox Wind continued to fly however, on new order announcements, joining Waaree and KP Green on the upper circuit. The biggest drop was seen in JSW Energy. Mid […] Read more
Environment Tech Funding- Solar Struggles As Energy Storage & Mobility Dominates Updated On Wed, Apr 24th, 2024 by Saurenergy Tracxn, a leading platform for tracking startups and private companies has released a detailed report on Environment Tech funding. the report has some interesting insights in the Indian context. Providing data backed analysis, the report points out that the Indian Environment tech sector has raised total funding of $7.3 billion till date. India’s environmental technology […] Read more
SECI Issues Bid For 20 MW Solar Plant With BESS In Leh Updated On Tue, Apr 23rd, 2024 by Saurenergy Solar Energy Corporation of India (SECI) has issued a tender inviting bids for design, engineering, supply, construction, erection, testing, commissioning, and operation and maintenance (O&M) of a 25 MW solar power project with a 20 MW/50Mh battery energy storage system at Taru, Leh in Ladakh. According to the tender document issued by SECI, the scope […] Read more
Karnataka, Gujarat Maintain Lead Among States On Clean Electricity Transition Updated On Tue, Apr 23rd, 2024 by Saurenergy Karnataka and Gujarat continued to showcase their leadership in the progress toward the clean energy transition, a new joint report by the Institute for Energy Economics and Financial Analysis (IEEFA) and Ember shows. This marks the second year of IEEFA and Ember collaboration on the Indian States’ Electricity Transition (SET) report, which evaluates the clean […] Read more
NTPC- REL Invites BOS Bids For 1110 MW Wind Project In Karnataka Updated On Mon, Apr 22nd, 2024 by Saurenergy NTPC Renewable Energy Limited (NTPC REL) released a tender inviting online bids for Inter State Transmission System (ISTS) connected wind energy project with a nominal capacity of 1110 MW in Bijapur region, Karnataka, Tranche – II The tender invited shared details for detailed design, engineering, micro-siting, manufacturing, supply, erection, testing, commissioning, and proving the guaranteed […] Read more
Order Wins, Strong Results Propel Green Energy Stocks on April 22 Updated On Mon, Apr 22nd, 2024 by Saurenergy The renewable bandwagon continues on its merry way, with just two out of the 11 stocks in our basket, ironically enough, the largest firms by revenues failing to rise along with the market today. Whole Tata Power and JSW Energy missed out, for KPI Green Energy, Shakti Pumps, Inox Wind Energy and Waaree Renewable, a […] Read more
Premier Energies To Seek Rs 1500 Crore In IPO Soon Updated On Mon, Apr 22nd, 2024 by Saurenergy Premier Energies Limited, India’s second largest integrated solar cell and solar module manufacturer (in terms of annual installed capacity of 2 GW and 3.36 GW, respectively as per a Frost & Sullivan Report), as of March 31, 2024, has filed the draft red herring prospectus (DRHP) with capital markets regulator, SEBI to raise more than […] Read more
Amara Raja Infra Wins Greenko’s 700MWp Solar Project Updated On Mon, Apr 22nd, 2024 by Saurenergy Amara Raja Infra Private Limited (ARIPL), part of the $1.75 billion Amara Raja Group, has achieved a significant milestone in its journey in the renewable energy sector by securing a solar BoS project of 500MW/700MWp from Greenko. The project, spanning across a 2,200-acre site near Uyyalavada Town, Kurnool District, Andhra Pradesh, marks ARIPL’s largest capacity […] Read more