SUBSCRIBE NEWS LETTER

renewable power in India

Indian Railways to Set Up 1 GW Solar Capacity by 2020-21

Indian Railways has an existing capacity of 71.19 MW of Solar plants from rooftops solar installations at various Railways stations. Ministry of Railways has planned to set up 1000 Mega Watt (MW) solar power by 2020-21 which would help Railways to source about 10% of its electrical energy from renewable source, Minister of State of […]

Read more

SECI Issues RfS for 1200 MW Wind-Solar Hybrid Power Projects

The maximum tariff payable to each WPD is fixed at Rs 2.85/kWh for the entire term of 25 years. State-owned Solar Energy Corporation of India (SECI) has issued Request for Selection (RfS) document for setting up of 1200 MW ISTS connected wind power projects (Tranche-VI) on “Build Own Operate” basis. This 1200MW solar-wind hybrid tender […]

Read more

India Received $3.2 Bn of FDI in Renewable energy in Last Three Years

In the first three months of the current financial year (2018-19), Rs 452 crore of FDI had already flown in, power minister R K Singh said. India has received Foreign Direct Investment worth $3,217 million in the renewable energy sector over the last three years from April 2015 to June 2018. According to data from the […]

Read more

Bids for 8 GW Wind Power Finalised: RK Singh

As on date, the bids for setting up of wind power projects of aggregate 8389.90 MW capacity have been finalized through SECI and NTPC. Taking giant leaps in the renewable energy secto0072, bids for setting up of wind power projects of aggregate 8389.90 MW capacity have been finalised through Solar Energy Corporation of India (SECI) […]

Read more

NCLT Allows Demerger of Emami’s Power and Cement Business

In the petition filed with NCLT, Emami pegged that the demerger will bring strength to each business with a focused and individual attention. National Company Law Tribunal’s Kolkata bench has recently approved the demerger of Emami’s solar power business, Emami Power, from its cement business, Emami Cement Limited. A petition was filed by the Indian […]

Read more

Bids for setting up of Wind Power Projects of over 8000 MW Capacity Finalised

The wind power projects in the country are installed on the basis of commercial viability through tariff based competitive bidding process. As on date, the bids for setting up of wind power projects of aggregate 8389.90 MW capacity have been finalised through Solar Energy Corporation of India Ltd. (SECI) and National Thermal Power Corporation Ltd. […]

Read more

3,217 Million US$ received as FDI in Renewable Energy Sector

Renewable Energy Capacity reaches about 74GW as on 30/11/2018 The FDI data cell of the Department of Industrial Policy and Promotion (DIPP) compiles and maintains the data of Foreign Direct Investment (FDI) Equity inflow received in the country. The FDI equity inflow from April, 2015 to June, 2018 in the Non-Conventional Energy Sector is as […]

Read more

LPU Students Create Solar Powered Driverless Bus

The first prototype of the bus will be used to ferry PM Narendra Modi to the Indian Science Congress venue which will be held in LPU. In a proud development, students from various department of Lovely Professional University (LPU) have recently designed and built a driverless car which is powered using solar energy. The first […]

Read more

India’s Energy Needs to Triple by 2040: World Bank

In fiscal 2018, when total installed capacity was more than twice the amount of peak demand, peak demand shortage still registered 2.1% in India,World Bank said. Energy demand in India will grow 30% between 2018 and 2040, a new report by the World Bank titled Dark: How Much Do Power Sector Distortions Cost South Asia […]

Read more
      SUBSCRIBE NEWS LETTER
Scroll