MAHAPREIT Calls Solar Developers to Bid for 50 MW Solar Plant Updated On Wed, Aug 16th, 2023 by Saurenergy Mahatma Phule Renewable Energy and Infrastructure Technology Limited (MAHAPREIT) has issued a tender to obtain offers from Solar Power Developers (SPDs) for the design, engineering, manufacture, supply, erection, testing and commissioning of 50 MW AC Crystalline Solar PV technology grid interactive solar PV power plant. It will also entail five years of operation and maintenance. […] Read more
Electrify America’s 75 MW Solar Farm Gets the Ball Rolling Updated On Wed, Aug 16th, 2023 by Saurenergy Electrify America, the open network of DC fast chargers for electric vehicles (EVs) in the US has kickstarted operations of its 75 MW solar renewable energy generation project referred to as Electrify America Solar Glow 1, located in San Bernardino County, CA. The Electrify America Solar Glow 1 extends to over a square mile and […] Read more
Siemens Announces 800 MW Inverter Manufacturing Capacity In US Updated On Wed, Aug 16th, 2023 by Saurenergy German Power major Siemens has joined the rush of firms seeking to benefit from the $360 billion plus subsidies on offer under the Inflation Reduction Act in the US. Announcing plans to begin manufacturing solar string inverters in Kenosha, Wisconsin, Siemens will make Blueplanet inverters at the new site, which it acquired from KACO in […] Read more
IREDA Reports Net NPA Reduction, Profit Jump In Q1 Fy24 Updated On Wed, Aug 16th, 2023 by Saurenergy Indian Renewable Energy Development Agency Ltd. (IREDA), a Mini Ratna (Category – I) Government of India enterprise under the administrative control of Ministry of New and Renewable Energy, has reported an all-time high Quarterly Profit After Tax (PAT) of Rs. 295 crores and Profit Before Tax (PBT) of Rs. 440 crores in the 1st Quarter […] Read more
Solar Aided In Electrification of 4.1 L Households Under ‘Saubhagya’: Govt Updated On Mon, Aug 14th, 2023 by Saurenergy Union Minister for New and Renewable Energy RK Singh, in his recent reply before the Lok Sabha, said that around 1.64 percent (4.1 lakh) of the rural and urban household-level electrification works undertaken under the Saubhagya scheme was done with the help of solar energy. “As reported by the States/UTs, a total of 2.86 crore […] Read more
SECI Issues RFS for 1300 MW Wind Power Projects Updated On Mon, Aug 14th, 2023 by Saurenergy SECI has issued an RfS for 1300 MW ISTS-connected Wind Power Projects (SECI-Tranche-XV). The tender has been issued under the standard bidding guidelines. The total capacity of 1300 MW will be awarded for injection at ISTS substations in the 3 (three) states, viz., Tamil Nadu, Telangana and Madhya Pradesh. The maximum capacities to be awarded […] Read more
Servotech Signs MoU with UP Govt for EV Charger Manufacturing Plant in Uttar Pradesh Updated On Mon, Aug 14th, 2023 by Saurenergy EV charger manufacturer Servotech Power Systems Ltd. has signed an MoU with the Government of Uttar Pradesh to set up an EV charger manufacturing plant in the state along with backward integration. The plant will be set up under the Uttar Pradesh Electric Vehicle Manufacturing and Mobility Policy 2022. The MoU was signed by […] Read more
DEWA Picks Masdar to Manage 1.8GW Mohammed bin Rashid Al Maktoum Solar Park Phase 6 Updated On Mon, Aug 14th, 2023 by Saurenergy Dubai Electricity and Water Authority (DEWA) has selected the state-owned renewable energy firm Masdar for the construction and management of the 1,800-megawatt (MW) phase 6 of the Mohammed bin Rashid Al Maktoum Solar Park. Reportedly, Saeed Mohammed Al-Tayer, DEWA’s managing director and CEO made the announcement. The project will be built at an estimated cost […] Read more
ACEN Inks RECAU Agreement with Laguna Lake Development Authority in Philippines Updated On Fri, Aug 11th, 2023 by Saurenergy Makati-based ACEN, through its subsidiary companies, entered into a significant Renewable Energy Contract Area Utilization (RECAU) agreement with the Laguna Lake Development Authority (LLDA) in the Philippines. The purpose of this agreement is to secure the lease of 800 hectares of Renewable Energy Areas (REAs) located in Laguna. This pivotal arrangement signifies ACEN’s commitment to […] Read more