MSMEs can Create 16 GW Rooftop Solar Capacity by 2022: Gadkari Updated On Wed, Mar 3rd, 2021 by Saurenergy Nitin Gadkari has said that MSMEs can create nearly 16 GW of rooftop solar capacity by 2022, meeting 40 percent of the 40 GW target. Union Minister of Micro, Small and Medium Enterprises (MSMEs) and Road Transport & Highways Nitin Gadkari has said that micro, small and medium enterprises (MSMEs) can contribute to creating nearly 16 GW […] Read more
Avaada Gets Decision From MERC for 250 MW Solar Project with MSEDCL Updated On Wed, Mar 3rd, 2021 by Saurenergy MERC had directed both parties i.e. Avaada and MSEDCL to complete the formalities under the RfS and execute the PPA by March 2, 2021. Avaada Energy (AEPL) had filed a case in January 2021 against Maharashtra State Electricity Distribution Company Ltd. (MSEDCL) with the Maharashtra Electricity Regulatory Commission (MERC) seeking issuance of appropriate order(s)/ directions(s) […] Read more
Axial begins the supply and installation of 150MW of its AxialTrack Updated On Wed, Mar 3rd, 2021 by Saurenergy The company is kicking-off 2021 by carrying out an ambitious project that underlines its AxialTracker with Blocking System’s status as a safe and reliable solar tracking system. Axial has begun the supply and installation of its AxialTracker 2V system as part of a 150 MW project based in the Andalusian province of Granada in southern […] Read more
PAT Cycle-II has Resulted in CO2 Emission Reduction of 70 MT: RK Singh Updated On Wed, Mar 3rd, 2021 by Saurenergy RK Singh in appreciation of the implementation of PAT Cycle – II, said that it has resulted in CO2 emission reduction of about 70 MT With an objective to accelerate Energy Transition in industrial sectors, Union Minister for Power, New and Renewable Energy RK Singh, recently chaired an interaction session with top management of energy-intensive […] Read more
450 MW Solar Plant In Johar State To Be Largest In Malaysia Updated On Tue, Mar 2nd, 2021 by Saurenergy The Sultan of Malaysia’s Johar State announced the development of a 450 MW solar PV power plant in the Pengerang municipal area. The development of a 450 MW solar PV power plant under the 2030 Johor Sustainable Development Plan has been announced by Ibrahim Ibni Almarhum Sultan Iskandar, the Sultan of the Johar state in Malaysia. […] Read more
Global Solar Capacity Set to Exceed 150 GW in 2021 Updated On Tue, Mar 2nd, 2021 by Saurenergy With an expected 150 GW of fresh solar capacity to be added in 2021, solar will continue to strengthen its place as the biggest contributor to fresh capacity additions worldwide in 2021. With almost 40 GW added in 2020, numbers that defied multiple predictions of hits from the Coronavirus pandemic, markets such as the US, […] Read more
Floating Solar On A Growth Path To 2027, Says TMR Updated On Tue, Mar 2nd, 2021 by Saurenergy Transparency market Research, a market intelligence firm, has predicted a strong 43 percent CAGR growth for floating solar between 2019 and 2027. According to the firm, no large land requirement, decrease in evaporation, and massive power generation are some of the important benefits that will influence the growth of the floating solar panels market. Floating […] Read more
Supervisor (Solar/Power System)/ (S-1 Grade) Job in SECI Updated On Tue, Mar 2nd, 2021 by Saurenergy Govt Jobs in renewable energy company solar energy corporation of India Ltd (SECI) Specification and Experience Candidate should have minimum 01 year of post-qualification experience in field of setting up of Solar / Wind / Hybrid Projects/ Power Generation/ Transmission. Qualifications: Diploma in Mechanical / Electrical / Civil Engineering. Age Limit: 32 Years No. of […] Read more
Jr Accountant / (S-1 Grade) Job in SECI Updated On Tue, Mar 2nd, 2021 by Saurenergy Govt Jobs in renewable energy company solar energy corporation of India Ltd (SECI) Specification and Experience Candidate should have 3 years in line post qualification experience in an organisation of repute. Qualifications: CA (Inter / IPCC) or CMA(Inter) or M.Com. or B.Com. (Hons.) with minimum 55% marks. Age Limit: 32 Years No. of Posts : […] Read more