New Aussie Law Aims to Remove Hurdles in Offshore Wind Expansion Updated On Fri, Sep 3rd, 2021 by Saurenergy The Scott Morrison-led conservative government in Australia has introduced a legislation that could help clear the way for offshore wind farms to go ahead in a country considered to have massive offshore renewable energy potential. The long awaited legislation will set up a framework for building, running, maintaining and decommissioning offshore electricity projects including wind […] Read more
Denmark Invites Bids for Third Technology-neutral Tender Updated On Fri, Aug 27th, 2021 by Saurenergy The Danish Energy Agency (DEA) has invited bids for a technology-neutral tender, where solar cell systems, wind turbines, wave energy plants and hydropower plants can compete for support. This is the third such tender launched by Denmark and will back around 428 MW of renewable energy projects using DKK 1.2 billion ($189.5 million) in state funds. The […] Read more
UP Regulator Eases Power Procurement From Exchanges For Industry Updated On Wed, Aug 18th, 2021 by Saurenergy The Uttar Pradesh Electricity Regulatory Commission, in its recent tariff order dated 29th July 21 for the financial year 2022 has made some key changes that could have a positive impact on the industry as well as renewable energy projects in the state. The regulator announced a reduction of up to 64 paise per unit […] Read more
Masdar JV Reaches Financial Close On Indonesia’s First Floating Solar Plant Updated On Wed, Aug 4th, 2021 by Saurenergy UAE-based renewable energy company Masdar and its partner PT PJBI announced today that their joint venture (JV) has achieved the financial close on the Cirata Floating Solar Power Plant project in Indonesia. The construction work of Indonesia’s first-ever floating solar power plant has begun. PT. PMSE (Pembangkitan Jawa Bali Masdar Solar Energi) is the JV […] Read more
Solar PV Design Specialist Updated On Sat, Jul 17th, 2021 by Saurenergy Independently conduct solar resource assessment and compute energy yields using industry standards simulating software tools. Able to independently conduct technical feasibility study of utility scale solar PV projects. Develop initial PV system concept of plant layout which shall essentially include technology assessment, tilt-pitch optimization, DC overload analysis. Detailed technical assessment of PV modules and inverters. Conduct […] Read more
Electrical Design Engineer – DC Updated On Sat, Jul 17th, 2021 by Saurenergy Design of DC side electrical engineering related Medium and large-scale Solar Photovoltaic Power plants. Ability to provide cost optimised design of the arrangement of the PV plant layout. Knowledge in DC side Engineering Specification and Standards (IEC, IEEE, ANSI, SEC, IS etc.) Shall be Familiar with Energy yield simulation in PV Syst. Shall be able […] Read more
TSEC Begins Trial Production of New 500 MW Solar Cell Line in Taiwan Updated On Fri, Jul 16th, 2021 by Saurenergy TSEC, a Taiwan-based solar cell and module manufacturer, has announced the beginning of its trial production of a new 500 MW solar cell line at its Yuanjing factory in Taiwan. The company has said that the new line is currently operating with an annual capacity of 400 MW. It is expected to produce cells with wafers […] Read more
Microsoft Commits to New Climate Goals: 100/100/0 by 2030 Updated On Thu, Jul 15th, 2021 by Saurenergy Tech giant Microsoft has announced new goals: by 2030, the company will have 100% of its electricity consumption, 100% of the time, matched by zero carbon energy purchases. The new commitment expands the scope of Microsoft’s existing aims to execute power purchase agreements equivalent to 100% of its energy needs by 2025. “At Microsoft we […] Read more
SECI’s 1200 MW ISTS Connected Solar Tender For Karnataka Is Out Updated On Wed, Jul 14th, 2021 by Saurenergy The Solar Energy Corporation of India (SECI) has finally floated the much awaited 1,200 MW ISTS-connected (Interstate transmission system) solar tender for (Tranche X) in Karnataka. A large tender for Karnataka comes after a significant gap, considering the high penetration of renewable energy in the state already. The last date to submit bids is Friday, […] Read more