NTPC Plans To Develop 300 MW Solar Project, Issues Tender Updated On Mon, Oct 28th, 2024 by Saurenergy NTPC recently released a tender to develop a 300 MW ground-mounted solar project and terminal bay near the NTPC Anta substation. It is accepting bids until 5th December 2024. The bidder will be responsible for arranging the land for the solar project and for the design, engineering, manufacturing, transportation, storage, installation, and commissioning of the […] Read more
Gensol Reports 29% Rise in Profits In Q2 Over Last Year Updated On Mon, Oct 28th, 2024 by Saurenergy Gensol Engineering Limited a prominent player in the renewable energy sector specializing in solar engineering, procurement, and construction (EPC) services, along with electric mobility solutions, announced its unaudited consolidated and standalone financial results for the second quarter and half year ended September 30th, 2024 (Q2 & H1 FY25). With a play across solar projects, O&M, […] Read more
Assistant Manager – Supplier Quality (Electrical) Updated On Fri, Oct 25th, 2024 by Saurenergy Ensure timely completion of TER products. Responsible for reviewing supplier documents such as TTR (Type Test Reports) and packaging methods, etc. Responsible for review and approval of MQP (Manufacturing Quality Plan). Responsible for monitoring the quality of inspections. Ensure receipt of TPIA inspection reports, review reports, and provide technical clearance within TAT timelines. Ensure timely […] Read more
Senior Site Engineer -Solar Updated On Fri, Oct 25th, 2024 by Saurenergy Role & responsibilities:- Site Administrations as per corporate Guidelines / Follow ups with local authorities Viz: EB, Other Admin bodies. Benchmarking and Analysis of PIs such as Generation, losses, auxiliary power consumption, equipment availability, PR etc to maximize plant efficiency. Follow Up with Customer on JMR and Receivables. Monitoring and verifying proper Project Handover and […] Read more
Green Stocks Oct 25: Green Stocks Continue To Suffer Setbacks Updated On Fri, Oct 25th, 2024 by Saurenergy Amid the overall downfall of the stock market, green companies continued to see difficult times too. Most of the green energy companies today reported negative growth except JSW Energy. JSW Energy was the only green stock that witnessed positive growth. The firm reported a total growth of 0.01 percent. This comes after the firm reported […] Read more
Sunora Solar Partners With Gujarat Giants For Pro Kabaddi League Updated On Fri, Oct 25th, 2024 by Saurenergy Sunora Solar and the Gujarat Giants have formally joined forces for Pro Kabaddi League Season 11! This partnership aims to assist one of the league’s teams and promote renewable energy. Sunora Solar stands with the Gujarat Giants as they get ready to show their prowess on the kabaddi court, advocating for a sustainable future driven […] Read more
Ladakh: NTPC, Indian Army Set To Build Solar Hydrogen Microgrid Project Updated On Fri, Oct 25th, 2024 by Saurenergy NTPC has partnered with the Indian Army to establish a Solar Hydrogen-based Microgrid at Chushul, Ladakh. This would provide a stable power supply using Green Hydrogen in off-grid Army locations. The Defence Minister Rajnath Singh laid the foundation stone of this unique project through video conferencing. NTPC has designed this solar hydrogen-based microgrid system to […] Read more
NTPC Limited Reports 14% Jump In Net Profits In Q2 Updated On Fri, Oct 25th, 2024 by Saurenergy NTPC Limited today issued its financial results for the second quarter (Q2) of FY25. The firm’s latest results reported a 14 percent growth in net profits. On a standalone basis, NTPC’s total income for H1 FY25 was ₹86,298 crore, compared to ₹81,199 crore for the same period last year. Profit After Tax (PAT) for H1 […] Read more
CERC Amends Indian Electricity Grid Code Rules Updated On Fri, Oct 25th, 2024 by Saurenergy The Central Electricity Regulatory Commission (CERC) recently issued amendments to the Indian Electricity Grid Code, originally released in 2023. These adjustments address various aspects of grid operation, including timeframes for power injection, scheduling of generation, compensation mechanisms, and revisions in scheduling flexibility. One amendment specifies limits on the injection of infirm power, or power generated […] Read more