MERC Declines To Re-Determine Wind Tariff On Actual CUF Updated On Fri, Jan 3rd, 2025 by Saurenergy The Maharashtra Electricity Regulatory Commission (MERC), in its latest order, has declined to amend a regulation retrospectively to re-determine tariffs. The case pertained to the re-determination of tariffs for wind power generators in Maharashtra. The order emerged when the state power utility MSEDCL approached the regulatory commission, arguing that actual tariff determination should be based […] Read more
CREDA Plans Rooftop Solar Under RESCO Mode, Issues Tender Updated On Thu, Jan 2nd, 2025 by Saurenergy Chhattisgarh State Renewable Development Agency (CREDA) recently invited expressions of interest (EOI) to select bidders to implement 20 MWp grid-connected rooftop solar systems under RESCO model. These projects will be located in registered housing societies in Chhattisgarh. The solar power generated under this project will be sold to registered housing societies in Chhattisgarh. Bids will […] Read more
Offshore Wind’s 2024 in India- Building Blocks Falling Into Place Updated On Mon, Dec 30th, 2024 by Saurenergy India’s offshore wind ambitions made slow but steady progress in 2024, egged on by multiple European partners pushing the country to try this ‘last frontier’ of renewable energy. For a country heading towards 100 GW of solar, and 50 GW of onshore wind, Offshore wind energy has been a distant dream, primarily because of cost […] Read more
PM-KUSUM: Fadnavis Inaugurates Grew’s 2 MW Solar Project Updated On Fri, Dec 27th, 2024 by Saurenergy Maharashtra Chief Minister Devendra Fadnavis recently inaugurated a 2 MW AC solar project installed under the PM-KUSUM Component – C. This project is an initiative by Maharashtra-based Aditya Green Energy in collaboration with Aviraj Green Energy Pvt Ltd. This solar project is located in Umarga, Dharashiv, Maharashtra. The project is estimated to generate approximately 47.34 […] Read more
NTPC-REL Floats 1.4 GW Tender To Build UP Solar Parks Project Updated On Tue, Dec 24th, 2024 by Saurenergy NTPC Renewable Energy, a subsidiary of NTPC Green Energy, has issued a tender to develop a 1,400 MW grid-connected solar project in two solar parks, namely Lalitpur (2×300 MW) and Chitrakoot (2×400 MW), in Uttar Pradesh (UP). The tender invites bids until January 13, 2025. The tender offers a Balance of System (BoS) package for […] Read more
Power Markets Analyst (Transmission and Interconnection) Updated On Mon, Dec 23rd, 2024 by Saurenergy The role will be focused in providing end-end Interconnection support for projects in various ISO/RTO queues, which includes Tariff Advisory, Interconnection Applications and Interconnection Strategy/analysis Prepare Interconnection Applications, including steady state, short-circuit and EMTRP models. Responsible for timely submittal of requests and client management Collecting and analyzing data for power flow modeling projects (i.e., Transmission […] Read more
Assistant Manager Updated On Fri, Dec 20th, 2024 by Saurenergy Responsibilities:- Test or evaluate photovoltaic (PV) cells or modules. Review specifications and recommend engineering or manufacturing changes to achieve Solar design objectives. Perform thermal, stress, or cost reduction analyses for solar systems. Develop standard operation procedures and quality or safety standards for solar park. Provide technical direction or support to installation teams during installation, start-up, testing, […] Read more
Senior Engineer – Quality Assurance & Control Updated On Fri, Dec 20th, 2024 by Saurenergy Responsibilities:- Good knowledge on Blade manufacturing Ability to setup & use NDT (UT) equipment’s and relevant analysis software Perform Hand & Machine UT Scan Fluent in English (Oral & Written) Proficient in Microsoft office for reporting day to day development Ability to work in a time-sensitive situation & get thing done with quality On time […] Read more
Assistant Manager CAD (CIVIL -SOLAR PROJECTS ONLY)) Updated On Thu, Dec 19th, 2024 by Saurenergy Responsibilities:- India and Overseas site visits during various phases of the project (pre-bid, construction, Operation and Maintenance) and prepare site visit report, site feasibility assessment and remedial measures for Solar PV plant as per requirement. Review preliminary investigation reports, Geo-technical, topography, hydrology and prepare executive summary from the reports and shall propose best suitable solution […] Read more