Solis’ Various Generating Capacities of Single Axis Horizontal Tracker pv Power Station Updated On Thu, Oct 18th, 2018 by Saurenergy “Double-sided PV module plus Single Axis Horizontal Tracker” is a new technology widely adopted by China’s third batch of photovoltaic pioneer program. However, “double-sided PV module” is a new technology that started in 2017, and many people are not aware of the power generation effects of actual projects. Here’s how, Ginlong Solis describes the power […] Read more
“DE-CENTERED” of China pv Module Manufacturers Updated On Mon, Oct 15th, 2018 by Saurenergy The PV module industry may leave a deep impression on people due to its ups and downs in development. Now, the industry has gradually entered the rational stage with the great tide of development. China’s rapid development of PV module industry has made European and American countries feel the pressure, so the global PV module […] Read more
KDC Solar Kicks off 23.5MW PV Plant Construction in New Jersey Updated On Wed, Oct 10th, 2018 by Saurenergy After completion, this project will be the largest net metered solar installation in New Jersey. Owner, operator and developer of solar power facilities, KDC Solar has begun construction on a 23.5MW solar photovoltaic (PV) system in Jackson, New Jersey. After completion, this project will be the largest net metered solar installation in New Jersey. Also, this […] Read more
Punjab Policy on Net Metering for Grid Interactive Roof-Top Solar PV Power Plants Updated On Mon, Oct 8th, 2018 by Saurenergy Scope and Application:- (1) This Policy shall apply to the distribution licensee and consumers of distribution licensee of the State of Punjab. (2) The eligible consumer may install the rooftop solar system under net metering arrangement which; (a) shall be within the permissible rated capacity as defined under this Policy. (b) shall be located in […] Read more
Solar System Installation Mandatory for New Building Approval: HC Updated On Mon, Oct 1st, 2018 by Saurenergy High court passed the interim direction on a plea moved by Tamil Nadu Spinning Mills Association alleging that Tangedco was backing down from producing wind energy deliberately. In a bid to force solar use by the public, Madras High Court (HC) has directed the government to add solar power system installations as a norm in the approval […] Read more
Sungrow Supplies 80 MW PV Inverters for Wyoming’s 1st Utility-Scale Solar Project Updated On Sat, Sep 15th, 2018 by Saurenergy Post completion of this solar project, the 80 MW system can meet the daily electricity demand of local residents, reduce the dependence on gas and thermal power, and improve energy structure effectively. One of the leading inverter solution supplier Sungrow is supplying 80 MW PV inverters for the first utility-scale solar project in Wyoming. Wyoming, known for Yellowstone National Park, […] Read more
AMU Conducts ‘Grid Connected Solar PV Rooftop’ Workshop Updated On Tue, Sep 4th, 2018 by Saurenergy AMU workshop is aimed at providing basic information on solar PV rooftop and raise awareness among entrepreneurs on the concept, design and components with specific focus on technical architecture of solar PV rooftop system. Aligarh Muslim University AMU, conducts a five-day ‘Grid Connected Solar PV rooftop Workshop’ under its ‘Green Initiative’. The Department of Electrical […] Read more
Sobha Carnation Inaugurates 69kWp Rooftop PV Plant along with Greenrays Enersol Updated On Thu, Aug 16th, 2018 by Saurenergy Further, this project is taken up under PPA model, wherein entire investment is done by Greenrays Enersol and power is consumed captively by the society for common loads through a Power Purchase Agreement (PPA) between both the entities. Taking another positive step towards going green, Sobha Carnation CHS, a reputed premier society in Kondhwa, Pune […] Read more
President assents Continuation Of Phase 3 of Off-Grid and Decentralized Solar PV Applications Programme Updated On Mon, Aug 13th, 2018 by Saurenergy The funds for Solar PV application implementation would be met from Plan allocation made during financial years 2018-19 onward with an overall Plan Outlay of Rs. 656 Crores. After the cabinet approved the continuation of Off-grid and Decentralized Solar PV Applications Programme – Phase III in financial year 2018-19, the President’s assent has deemed the continuation […] Read more