MEDA Invites EoI To Build 10 MW Rooftop PV System On Gov Buildings Updated On Fri, Jun 28th, 2024 by Saurenergy Maharashtra Energy Development Agency (MEDA) a state nodal agency under the Ministry of New and Renewable Energy (MNRE) recently released a tender inviting to set up 10 MW grid-connected rooftop solar PV systems. This project falls under RESCO mode on government sector buildings terraces. MEDA in its tender invited bids to discover tariffs for rooftop […] Read more
Punjab Invites Bids for 10 MW Cumulative Grid-Connected Rooftop Solar PV Systems Updated On Thu, Mar 16th, 2023 by Saurenergy Punjab Energy Development Agency has issued a tender for the implementation of a tentative 10 MW cumulative grid-connected rooftop solar PV systems under RESCO mode at various locations in the state of Punjab. The tender fee is Rs 5,000. The processing fee is Rs 2,360. The EMD amount is Rs 20,00,000 (two lacs per MW […] Read more
Influence of Azimuth and Tilt on Yield of PV System Updated On Wed, Nov 30th, 2022 by Saurenergy Background The tilt and azimuth of a solar panel have a great influence on the energy yield of the overall system. The same panel, at the same installation site, can have different azimuth or tilt. This is a topic we are often asked about so in this Solis seminar, we explore the subject further. About […] Read more
Uttar Pradesh Invites E-Tender for 38 MW Of Solar PV System Updated On Tue, Jul 12th, 2022 by Saurenergy A tender for 38 MW of rooftop solar system has been floated by Uttar Pradesh New And Renewable Energy Agency (UPNEDA). This solar project will be executed under The Ministry of New and Renewable Energy (MNRE) GCRT Phase-2 scheme. The last date of submitting the bid is July 31, 2022 and the bid will open […] Read more
Cleantech Solar commissions 1 MW rooftop solar PV system for SeniorAerospace in Thailand Updated On Tue, Mar 29th, 2022 by Saurenergy Cleantech Solar has commissioned a 1 MW on-site rooftop solar PV system at the manufacturing facility of Senior Aerospace Thailand in Laem Chabang. The project provides solar power to Senior Aerospace under a long-term Power Purchase Agreement (PPA), signed between Senior Aerospace (Thailand) Ltd., a subsidiary of Senior plc – an international manufacturer of high-technology components […] Read more
The Influence Of Winter On Solar PV Systems And Related O&M Considerations Updated On Mon, Dec 20th, 2021 by Saurenergy Background Winter is well and truly on its way for the northern hemisphere with temperatures beginning to fall and already reaching freezing point in some regions. According to forecasts there will be prolonged periods of icy and snowy weather in Europe on its way. So, what are the specific effects of winter on the operation […] Read more
Correct Use of Aluminum Core Cables in PV Systems Updated On Mon, Oct 4th, 2021 by Saurenergy Grid transmission cables are usually aluminum core. Therefore, in the construction of PV plant projects in residential and commercial areas (especially household PV plant), many users will use aluminum core cables to directly interface with inverter output ports or circuit breakers ports. This can cause many safety problems. This Solis seminar will share the correct […] Read more
The Influence Of Salt Spray And High Humidity Environments On Solar PV systems Updated On Tue, Sep 7th, 2021 by Saurenergy Background The working environment of a PV plant is relatively complex, and extreme environments such as high/low temperature, humidity, salt spray, heavy sand and other harsh environments, can test the reliability and environmental adaptability of the PV system. More and more PV plants are being built on water, desert, and in coastal areas. 2-3 years […] Read more
MNRE Issues Benchmark Costs for Rooftop Solar PV Systems for FY22 Updated On Fri, Aug 20th, 2021 by Saurenergy The Ministry of New and Renewable Energy (MNRE) has issued a notification with the latest benchmark costs for the installation of new grid-connected rooftop solar PV systems for the present financial year i.e. 2021-22 (FY22). Benchmark costs for FY22 for general category states/UTs are as follows: Benchmark costs for Special Category States/UTs (i.e. North-Eastern States including Sikkim, Himachal […] Read more