Meghalaya Govt Unveils Policy To Boost Solar, Wind Energy Capacity Updated On Mon, Dec 16th, 2024 by Saurenergy The Meghalaya government recently released its policy to execute and expand solar power generation in the state, aiming to increase its solar power capacity from the current 4.28 MW (Till Nov. 2024). The latest policy released by the state allows short-term power purchases on behalf of the State Distribution Utility, entering into Power Purchase Agreements […] Read more
QA/QC Manager – Wind Towers Updated On Fri, Dec 13th, 2024 by Saurenergy Ensure and continuously improve quality of suppliers and their deliveries. Support and drive cross-functional cooperation with Procurement, Quality Management, Manufacturing and Logistics, R&D or/and Project Management (PM). Ensure compliance of SQM with applicable regulatory and quality requirements. A passion for renewable energy and a sense for the importance to lead the change. We are also […] Read more
Indus Towers, JSW Arm Invest Rs. 38.03 Cr For 130 MW Solar Project Updated On Fri, Dec 13th, 2024 by Saurenergy Indus Tower, a Haryana-based telecom tower company today entered into a power purchase agreement (PPA) with JSW Green Energy Eight Limited, a special purpose vehicle (SPV). Under this agreement, Indus Tower would receive 130 MW of renewable energy from a solar power plant under captive mode. The company also agreed to make approximately Rs 38.03 […] Read more
Parliamentary Panel Bats For More Household Level Electrification Updated On Fri, Dec 13th, 2024 by Saurenergy A Parliamentary Standing Committee On Energy has now presented its first report of the panels. The panel in their key recommendations batted for the inclusion of more households for electrification. The panel was chaired by Lok Sabha MP Appa Barne. The panel also advocated for the use of more funds for the Scheduled Caste and […] Read more
Adani Green Subsidiary Commissions 250 MW Solar Project At Rajasthan Updated On Thu, Dec 12th, 2024 by Saurenergy Adani Green Energy Limited (AGEL), step-down subsidiary, Adani Green Energy Twenty Five Limited, recently commissioned its 250 MW solar power project. This project is located at Badi Sid, District in Jodhpur, Rajasthan. With the commissioning of this plant, AGEL’s total operational renewable generation capacity has increased to 11,434 MW. Earlier this year, the company commissioned […] Read more
Reliance Subsidiary Wins SECI’s 930 MW Solar, 1860 MWh BESS Project Updated On Thu, Dec 12th, 2024 by Saurenergy Reliance Power Limited (Reliance Power) subsidiary, Reliance NU Suntech Private Limited (Reliance NU Suntech), has won a 930 MW solar contract with a battery energy storage system project (BESS). Reliance secured this project from Solar Energy Corporation of India (SECI) in an e-reverse auction held on 9th December 2024. Reliance NU Suntech’s successful bid for […] Read more
Jevargi, Juniper, Avaada, and ACME Secure 1.2 GW FDRE Tender Updated On Thu, Dec 12th, 2024 by Saurenergy NHPC, has announced the winners of its 1.2 GW Firm and Dispatchable Renewable Energy (FDRE) VI auction. It awarded the bids to four winners: Jevargi Solar Power (Rays Power Infra), Juniper Green Energy, Avaada Energy, and ACME Solar Holdings. The tender for this project was released in June this year, and the results have been […] Read more
DCS Engineer – BOP Area Lead Updated On Wed, Dec 11th, 2024 by Saurenergy You would be Area lead for the control system projects based on SPPA T3000 / PCS7 and shall be key in conceptualization of the system to be delivered to customer. As part of your responsibility you would lead engineering & commissioning of Boiler/Turbine/ Balance of Plant control system area for steam or gas turbine, in […] Read more
SECI’s 4 GWh BESS Tender Finds Takers At Rs 3.52/kWh Updated On Tue, Dec 10th, 2024 by Saurenergy NTPC Renewable Energy, Sembcorp Green Infra, Solarcraft Power India 8 and Hero Solar Energy have all bid at Rs 3.52 to emerge winners from SECI’s largest Solar+Storage tender till date for 2 GW Solar plus 4 GWh BESS. While NTPC won 500 MW, Hero walked away with 270 MW, with the rest getting 150MW allotments […] Read more