GE Renewable buys stake in 3D Printing Firm COBOD International Updated On Sat, May 7th, 2022 by Saurenergy GE Renewable Energy has said that it has done a minority investment in COBOD International, the company providing the 3D printer used at the Bergen research facility and has helped the development of renewable energy in various countries. Officials from both companies said the investment will build on an existing relationship with COBOD International first […] Read more
Manager, End User Engineering Updated On Fri, May 6th, 2022 by Saurenergy Responsibilities:- Deliver process engineering services that meet Worley’, its customers’ and applicable statutory and regulatory specifications, on time and within budget. Initiate, manage and if required supervise process engineering project requirements. Perform process engineering services such as: participate in relevant meetings, prepare progress reports and follow required checking procedures; ensure the project scope is clear […] Read more
Renewable Energy Supply Increases By 15.5 GW: CEEW-CEF Updated On Fri, May 6th, 2022 by Saurenergy New capacity addition of non-hydro renewable energy increased to 15.5 GW during FY22, according to the latest edition of the CEEW Centre for Energy Finance (CEEW-CEF) market handbook on May 6. Compared to 7.7 GW installed in the previous FY, it is quite an improvement. However, it is a poor consolation given India has the […] Read more
Senior Site Structural Engineer Updated On Fri, May 6th, 2022 by Saurenergy We are currently seeking candidate for Senior Structural Site Engineer position to represent BH on our ongoing and future sites, primarily in Mumbai but expandable to Pan India. As part of this, review compliance of the structural works against the specified technical requirements in the Design Deliverables and Contract Documents supported by the Buro Happold India based […] Read more
Assistant Manager- Electrical (ERC) Updated On Fri, May 6th, 2022 by Saurenergy Basic Engineering of Electrical work Review of detailed engineering for Electrical work Key Responsibilities:- Primary Area of Responsibility – 90%:- Selection of Electrical Equipment as per process requirement, P & I D and Tender Documents, and Scrutinized the scope of work for Electrical. Preparation of Electrical Documents i.e. Electrical Load List, MCC Sizing, SLD, Cable […] Read more
Why B2B Companies Are Opening Arms For EVs For Their Supply Chain Updated On Fri, May 6th, 2022 by Saurenergy The logistics industry in India is witnessing a steady growth in the adoption of electric vehicles (EVs) to carry last-mile operations. The introduction of newer electric vehicle models and technological innovations in making electric vehicles are attracting businesses to adopt EVs ownership. The introduction of upgraded EVs and technological innovations in this sector are attracting […] Read more
Engineer – Power Quality Solutions Updated On Fri, May 6th, 2022 by Saurenergy Responsibilities:- Preparation of cubicle design (Control & Protection) drawings. Preparation of Manufacturing documents for cubicles. Estimation of Aux. power requirements. Estimation & Sizing of Aux. power / control cables. Preparation of FACTS Plant design drawings (Secondary). Preparation of Junction box drawings. Purchasing of cubicles, cables, Junction boxes, Battery system etc. Co-ordination with other departments ( […] Read more
R&D Engineer Updated On Fri, May 6th, 2022 by Saurenergy Responsibilities:- Full product development experience on products like, grid tied inverter, static VAR Generator, STATCOM, Active harmonic filter, battery storage system, solar inverter etc. Selection and design of different topologies and selection of power devices, design of passive components like inductors, PWM reactors, line reactors, capacitors, heatsink, thermal design of power converter for different power […] Read more
Nexcharge Starts Production of Li-ion Battery Packs and Modules Updated On Fri, May 6th, 2022 by Saurenergy Nexcharge has announced the inauguration of its manufacturing plant at Prantij, Gujarat which is spread across 6 lakh square feet for the production of Li-ion battery packs and modules (Pouch/ Prismatic/ Cylindrical Nexcharge says that the facility has 6 fully automated assembly lines and testing labs with an installed capacity of 1.5 GWh and will […] Read more