Altigreen & Bolt.Earth Sets Sights on Deployment of 100 3.3 kW Charging Stations Updated On Fri, Nov 3rd, 2023 by Saurenergy Altigreen, which manufactures electric vehicles designed for last-mile applications, has entered into an agreement with Bolt.Earth, a firm which provides electric vehicle charging infrastructure. The two firms have together set sights on the deployment of a hundred 3.3 kW charging stations for electric three-wheelers within a month. Further, they intend to set up more than […] Read more
US May See 619 GW Of Renewable Power Between 2023-2030: Report Updated On Fri, Nov 3rd, 2023 by Saurenergy A latest report from BloombergNEF forecast a staggering 619 gigawatts (GW) of solar, wind and storage to come online between 2023 and 2030 in the United States. The report forecasts that this will raise energy capacity by 19 GW from the previous outlook. While structural constraints, such as permitting and grid connections, and a higher […] Read more
NTPC REL Issues Tender for Substation Pkg for 630 MW Solar Park Updated On Fri, Nov 3rd, 2023 by Saurenergy NTPC Renewable Energy Limited (NTPC REL) has issued a tender inviting online bids from eligible bidders on single stage two envelope (envelope-I: techno-commercial bid and envelope-II: price bid) basis for substation package under development of 630 MW Barethi Solar Park. Brief Scope of Work 1. Design, engineering, supply, erection, testing and commissioning of- a. 400 […] Read more
Heating Device That Uses Renewable Energy In High Altitude Areas Updated On Fri, Nov 3rd, 2023 by Saurenergy Hyderabad based WindStream Technologies, which offers hybrid solar and wind patented products, has joined hands with the Centre for Energy Research (CER) towards the establishment of a collaborative framework for the development, production, and promotion of a modular room heating device, Sustainable Excess Energy Generator (SEEGeN). Designed with Super Metals, the product has applicability in […] Read more
Lead Engineer – Process Quality Assurance Updated On Thu, Nov 2nd, 2023 by Saurenergy If you desire to be part of something special, to be part of a winning team, to be part of a fun team – winning is fun. We are looking forward to hire Lead Engineer – Process Quality Assurance in Pune, India. In Eaton, making our work exciting, engaging, meaningful; ensuring safety, health, wellness; and being a model of inclusion & […] Read more
Manager – Supply Planning EMEA & APAC Updated On Thu, Nov 2nd, 2023 by Saurenergy This Position is part of the Materials function of the Global Supply Chain CoE reporting to the Operations Manager – Materials The Supply Planning Manager will be responsible to support the Global Eaton Electrical Sector EMEA and APAC Business for Supplier Planning deliverables and will be required to provide leadership direction to the team of […] Read more
Trina Solar Leads Industry With Shipments of 210mm Modules Updated On Thu, Nov 2nd, 2023 by Saurenergy Trina Solar has reported revenue of $11.58 billion (RMB 81.12 billion) in the first three quarters of 2023, 31.22 percent more than in the corresponding period last year. The company’s report, made public on October 27, also showed that Trina Solar, continues to lead the industry with 45-46 GW modules shipments, ranking second globally, and […] Read more
Assistant Engineer Design Updated On Thu, Nov 2nd, 2023 by Saurenergy Work Independently and cooperatively with the team of engineers and technical staff in the Business Unit in the preparation of quotations and execution of projects as and when required. Should have high proficiency in reading P&ID’s and other related mechanical drawings. Knowledge about piping Knowledge of Hygienic design standards used in FMCG Industry will be […] Read more
CEA To Verify Captive Status Of Power Plants Every Year: Draft Rules Updated On Thu, Nov 2nd, 2023 by Saurenergy The Central Electricity Authority (CEA) released a draft guidelines on the issue of verification of the captive status of power generation plants. It has now asked the stakeholders and other people concerned to send in their comments on the issue by December 1, 2013. These norms will be applicable for the generating plants where the […] Read more