Team Leader- Electrical & Instrumentation Updated On Tue, Feb 27th, 2024 by Saurenergy At least 12 years of experience with BE or B.Tech in electrical / Instrumentation and shall be having the following experience: Designing and estimation of power, control and instrumentation systems for Engine/ Motor driven compressors in safe & hazardous areas for various gases applications like Air, Nitrogen, LNG, CNG gas, Biogas application packages etc. Pre/Post-bid […] Read more
Head-Supply Chain -Retail Engineering Updated On Tue, Feb 27th, 2024 by Saurenergy Support procurement for Vendor development for retail engineering Supply Items. Developing,reviewing,renewing specifications for Retail engineering supply items. Developing SOPs, Policies & Guidelines related to Retail Engineering Activities. Helping procurement for negotiations,rate builtup. Cost Optimisation New Ideas & implementation. Standardising Materials, machineries and Equipments Coordinating with vendors,zones and ensuring timely dispatches. Ensuring proactive action for filed […] Read more
Power Systems Engineer Updated On Tue, Feb 27th, 2024 by Saurenergy Responsibilities:- Project Management in Power system studies on Renewable energy (onshore and offshore wind, solar) grid integration. Experience in Load flow studies, system loss calculations, short circuit study, transient & dynamic stability study, voltage stability study, performing short circuit, arc flash, and voltage drop study. Experience with power system simulation packages such as PSS/E, ETAP, […] Read more
GIPCL Invites Bids For EPC Package For 500 MW Solar Project Updated On Tue, Feb 27th, 2024 by Saurenergy Gujarat Industries Power Company Limited (GIPCL) has issued a tender inviting bids for a 500 MW solar power plant across the state of Gujarat. The tender is regarding the GIPCL selection process for the appointment of a contractor for the EPC Package along with the power evacuation system up to the GETCO substation for the […] Read more
Cliantech, Cosmic PV Power Sign Pact For 600 MW TOPCon Production Updated On Mon, Feb 26th, 2024 by Saurenergy Gujarat-based solar module manufacturer Cosmic PV Power and Cliantech have signed a Memorandum of Understanding (MoU) to boost production of TOPCon technology. The MoU was signed between the two parties at the recently-held Inter Solar event in Gandhinagar, Gujarat. Cosmic said that the new partnership would help in adding 600 MW of TOPCon production line […] Read more
SECI Invites Pre Bid For 900 MWp PV Modules & Cells Manufacturing In India Updated On Mon, Feb 26th, 2024 by Saurenergy Solar Energy Corporation of India (SECI) released a tender inviting bids for domestically manufactured solar PV modules with solar cells. The tender invited bids for domestic manufacturing, testing, packing and forwarding, supply, and transportation of the 900 MWp project. The document mentioned the pre-bid for the project to be placed at 11 am on 27th […] Read more
Log9 Materials Partners With ETO Motors To Power Electric Three-Wheelers Updated On Mon, Feb 26th, 2024 by Saurenergy Log9 Materials, an innovator in advanced battery technology, announced a strategic partnership with ETO Motors, a pioneer in Electric Mobility as a Service (eMaaS) and a manufacturer of electric three-wheeler vehicles (3W EVs), to provide sustainable and reliable battery solutions for ETO Motors’ fleet. This collaboration marks a step forward in promoting electric mobility and […] Read more
NLC India Invites Bid For Central Inverters For 600 MW Khavda Solar Project Updated On Mon, Feb 26th, 2024 by Saurenergy NLC India has issued a tender inviting bids for the supply of central inverters for a 600 MW Solar Project in GSECL’s Solar Park at Khavda inGujarat. The bids have been sought under a two-part system followed by reverse bidding. This 600 MW Solar Power Project will be developed by NLCIL through its wholly-owned subsidiary […] Read more
Largest Solar Battery Project By SECI Commissioned in Chhattisgarh Updated On Mon, Feb 26th, 2024 by Saurenergy Solar Energy Corporation of India Limited (SECI), under the Ministry of New and Renewable Energy, has commissioned India’s largest Battery Energy Storage System (BESS). The project was inaugurated by PM Modi on February 24. The 40 megawatts (MW) / 120MWh BESS with a solar photovoltaic (PV) plant which has an installed capacity of 152.325 megawatt […] Read more