SUBSCRIBE NEWS LETTER

pli scheme

Second Deadline Extension For SECI’s  97.5 MW Rooftop Solar Scheme

The last date for bid submission has been extended from April 11, 2019, to April 16, 2019. The Solar Energy Corporation of India (SECI) has extended the deadline for bid submission for its 97.5 MW grid-connected rooftop solar PV system scheme for government buildings in different states/union territories of India under RESCO/CAPEX model. The last […]

Read more

SECI Issues Amendments For its 97.5 MW Rooftop Solar Scheme For Govt Buildings

The Solar Energy Corporation of India (SECI) has issued amendments and clarifications for the implementation of 97.5 MW grid-connected rooftop solar PV system scheme for government buildings in different states/union territories of India under RESCO/CAPEX model. Besides amendments to the provisions and guidelines of the RfS document, SECI has also extended the bid submission deadline […]

Read more

Gujarat’s Troubles with SKY Scheme a Lesson For all State Governments

2018 saw a slew of state governments announce solar power schemes that would generate additional income for their farmers. There are many challenges to making this work on the ground, as the Gujarat Example shows. It was back in June 2018 that the Gujarat government launched its Suryashakti Kisan Yojana or SKY scheme. The scheme […]

Read more

SECI Issues RfS For 97.5 MW Rooftop Solar Scheme For Govt Buildings

The ceiling tariff for general category states and union territories and for special category states and Islands is Rs 3.50/kWh. The Solar Energy Corporation of India (SECI) has issued the Request for Selection Document (RfS) for the implementation of the 97.5 MW of grid-connected rooftop solar PV projects for government buildings in different states and […]

Read more

Cabinet Approves Second Phase of FAME Scheme with Outlay of Rs 10,000 Cr

The Union cabinet has approved the second phase of the FAME scheme with an incentive layout of Rs 10,000 crores. The Union Cabinet chaired by Prime Minister Narendra Modi has approved the proposal for the implementation of the Rs 10,000-crore Faster Adoption and Manufacturing of Electric Vehicles in India Phase II (FAME-II) scheme for promotion […]

Read more

Modi Cabinet Approves 25.7 GW Solar Scheme to Benefit Farmers

In another move that is deadlined 2022, or in time to help the country meet its 100 GW target for solar, the government approved a major scheme to get farmers involved. The KUSUM (Kisan Urja Suraksha evam Utthaan Mahabhiyan) scheme has been in the works for some time and seeks to provide both financial security […]

Read more

List of BIS Standards Applicable for Components of Solar PV Applications Issued

The list includes six products along with Indian Standard Number and the Title of Indian Standard. The Ministry of New and Renewable Energy (MNRE) has also issued the list of BIS standards applicable for components of solar PV applications. The list includes six products along with Indian Standard Number and the Title of Indian Standard. […]

Read more

MNRE Issues Draft Scheme on Indian Wind Turbine Certification

The scheme will not only provide a framework for standards, but also cater to the technical regulations and requirements Consolidating National and International Standards, Ministry of New and Renewable Energy (MNRE) has issued a draft scheme on wind turbines in India. Known as the ‘Indian Wind Turbine Certification Scheme’ (IWTCS), the draft has been prepared […]

Read more

MNRE circulates draft Indian Wind Turbine Certification Scheme (IWTCS)

Ministry of New and Renewable Energy, in consultation with National Institute of Wind Energy Chennai, has prepared a draft of new Scheme called Indian Wind Turbine Certification Scheme (IWTCS) incorporating various guidelinesTurbine Certification Scheme (IWTCS). The IWTCS is a consolidation of relevant National and International Standards (IS/IEC/IEEE), Technical Regulations and requirements issued by Central Electricity […]

Read more
      SUBSCRIBE NEWS LETTER
Scroll