RWE Begins Construction of Aldenhoven Wind Farm In West Germany Updated On Tue, Apr 16th, 2024 by Saurenergy Renewable Energy firm, RWE Energy has begun the construction of a new wind energy farm in Germany. The new wind farm is being built in the Rhenish lignite area. The ground is being prepared, the construction site is being set up and road works are beginning. RWE is erecting six wind turbines with a total […] Read more
BPCL Awards 52 MW Solar Consultancy Contract To Ahasolar Technologies Updated On Mon, Apr 15th, 2024 by Saurenergy Bharat Petroleum Corporation (BPCL) has announced it has awarded the consultancy contract for setting up a 52 MW solar power project in Prayagraj, Uttar Pradesh to Ahasolar Technologies. The tender for the solar power project was floated by BPCL in February. Under the ambit of the project, BPCL has planned to power its refineries through […] Read more
France Issues Rules For Agrivoltaic Use To Clear Ground For Faster Adoption Updated On Fri, Apr 12th, 2024 by Saurenergy Recently, the French government came out with its Decree No. 2024-318, which covers the use of agrivoltaics on French Farmland, forests or even natural land. Coming at a time when module prices in Europe have dropped to a level where even less efficient options like Solar Fencing is being taken up in Germany, Switzerland and […] Read more
Senior PCB Layout Designer Updated On Tue, Apr 9th, 2024 by Saurenergy The PCB Layout Design team is responsible for the layout designs of all the Hardware products/projects, and you will work with our Power Electronics and Mechanical Engineers. The work includes working with Power, Analog, Digital, and Communication circuits. Responsibilities:- Collaborate with cross-functional teams, including Hardware and Mechanical engineers, production site and product managers to ensure […] Read more
Power Electronics Engineer Updated On Tue, Apr 9th, 2024 by Saurenergy As a Senior Power Engineer at SolarEdge India R&D, you will play a pivotal role in the design, development, and optimization of power electronics and power electronics systems for our advanced solar energy products. You will be responsible for driving the innovation and technical excellence of our power solutions, contributing to the success of SolarEdge’s […] Read more
To Meet AgriPV Capacity Of 20 GW In India By 2040, 1.1 Lakh Jobs To Be Created-Report Updated On Mon, Apr 8th, 2024 by Saurenergy India’s potential for Agri-Photovoltaic (APV) varies significantly across districts, ranging from 3,156 GW to 13,803 GW for various APV technologies according to recent report. In a report by the Fraunhofer Institute for Solar Energy Systems, EY, and CSTEP they projected APV capacity from 2024 to 2040, to achieve a cumulative addition of 20 GW and […] Read more
South Africa’s Solar Adoption Gathers Pace, But Challenges Remain Updated On Thu, Apr 4th, 2024 by Saurenergy South Africa has long been plagued by an energy crisis now. This has led to a situation where the nation faces rolling blackouts or load shedding as it has been called, for the past decade and more. It says something for the state of the power sector that a challenge that was predicted well over […] Read more
Alpex Solar To Set Up Second Panel Manufacturing Facility In Mathura Updated On Thu, Apr 4th, 2024 by Saurenergy Noida-based Alpex Solar will be setting up its second solar panel manufacturing facility in Mathura, Uttar Pradesh. The company said it has got the approval from Uttar Pradesh State Industrial Development Authority (UPSIDA) to secure 7 acres of land in Mathura for which the payment will be done soon. According to Alpex Solar, the firm […] Read more
NTPC-REL Invites Bids For 500 MW Solar Project In Rajasthan Updated On Wed, Apr 3rd, 2024 by Saurenergy NTPC Renewable Energy Limited (REL) a wholly owned subsidiary of NTPC Limited invited bids for the balance of the system package of a 500MW state transmission utility (STU) connected solar PV project in Bhadla, Rajasthan. NTPC Renewable Energy Limited (NTPC REL) invited online bids from eligible bidders on single-stage two envelopes (i.e. Envelope-I: Techno-Commercial Bid […] Read more