Principal Engineer – Control & Instrumentation Updated On Wed, Nov 13th, 2024 by Saurenergy Wood is currently recruiting for Principal Engineer Control & Instrumentation, Experience in Design and Detail Engineering including preparation of Instrument Index, Data Sheet, Specification for Field Instruments and Control systems, SAMA/Logic diagrams, HAZOP, SIL, Control system engineering including FAT/ SAT, Sizing of Flow Element Valves, Construction drawings and knowledge in DCS/PLC systems. Responsibilities:- 15-20 years […] Read more
India’s RE Investment Hits USD 12.4 Bn, Falls Short of 2030 Target: Report Updated On Tue, Nov 12th, 2024 by Saurenergy India’s renewable energy investment has grown to USD 12.4 billion in 2023, up from 2020. However, investment remains far below the estimated USD 200 billion required to achieve India’s goal of 500 GW of non-fossil fuel electricity capacity by 2030. According to the Zero Carbon Analytics report’s findings, to meet the 500 GW of non-fossil […] Read more
Construction Senior Manager Updated On Fri, Nov 8th, 2024 by Saurenergy Coordinates and supervises Installation / Commissioning activities, leads and advises a team of qualified professionals and technicians and ensures adherence to processes and procedures. Leads, develops and motivates a group of dedicated qualified employees and professionals functionally to achieve the targets set. Ensures adherence to defined guidelines, processes and procedures, for the Installation / Commissioning […] Read more
Electrical Drafter / Developer Updated On Fri, Nov 8th, 2024 by Saurenergy Generate electrical schematics based on SE WP platform requirements with the EPLAN software. Analysis of current schematics versions to identify the modifications required by the retrofits. Modification/adaptation of current schematics based on technical specifications, and requirement of platform engineer. Manage and update the automatized system tool (WEDT) to produce Wind Farm specific schematics. Qualification and […] Read more
Hybrid Projects Demand More Planning: Naresh Mansukhani (CEO, Juniper Green) Updated On Fri, Nov 8th, 2024 by Saurenergy Tell us about the journey of Juniper Green in India till now. We launched Juniper Green as a solar-focused platform in 2018, primarily because solar energy is more predictable. During that time wind project tariffs were dropping too low. In 2021, we expanded our capabilities to include wind and storage projects. As a result, we […] Read more
Could The Trump Presidency Cast A Shadow On Indian Solar Module Makers? Updated On Fri, Nov 8th, 2024 by Saurenergy The re-election of Donald Trump as the new President of the United States (US) may alter the market dynamics for Indian solar module manufacturers. Speculations are now rife over the likely fate of the Indian solar industry with Trump’s re-election. Those who have business interests in the US solar market are likely to get affected […] Read more
Can India See Large Wind Turbines Beyond 6 MW? Updated On Wed, Nov 6th, 2024 by Saurenergy The upper ceiling of large wind turbines in India is on the rise. Irrespective of the deployment of the same in capacities upto 8 MW to 10 MW in foreign countries like China, India’s tryst with these large structures is limited by costs for now. Going by the government numbers, there are more than eight […] Read more
NTPC, ONGC Form JV For Renewable Energy Updated On Mon, Nov 4th, 2024 by Saurenergy Maharatna PSUs NTPC and ONGC have collaborated to form a Joint Venture Company (JVC) through their Green Energy Subsidiaries (NTPC Green Energy Ltd. and ONGC Green Energy Ltd.) to further promote their interest in renewable and new energy arena. Subsequent to the signing of the Joint Venture Agreement on 7th February 2024, during India Energy […] Read more
Juniper, Jakson Green & RIH Bag GUVNL’s 200 MW Wind Project Updated On Wed, Oct 30th, 2024 by Saurenergy Gujarat Urja Vikas Nigam Limited (GUVNL) has now declared Juniper Green Energy, Jakson Green, and RIH Renewables (EDF Renewables) as winners of its (Phase VIII) 200 MW wind energy project in Gujarat. The tender for this project was released in July this year, and the results were released within four months. Gujarat Urja Vikas Nigam […] Read more