Tata Power Solar Systems Bags Rs. 188 Crore EPC Contract From NHPC Updated On Wed, May 26th, 2021 by Saurenergy NHPC, an Indian government hydropower board under the ownership of Ministry of Power, announced yesterday its placement of an order amounting to Rs 188.19 crore with Tata Power Solar Systems Ltd, a Mumbai-headquartered solar energy services provider, to set up a 40 MW solar power project at Ganjam, in Odisha. Tata Power Solar, a wholly-owned […] Read more
Etrio Steps Into E4W Light Commercial Vehicle Segment Updated On Thu, May 20th, 2021 by Saurenergy Hyderabad-based electric vehicle (EV) maker Etrio has announced that it is planning to step into the electric 4-wheeler (E4W) light commercial vehicle (LCV) segment along with plans to launch more electric 3-wheeler products. The EV maker also announced its entry into the B2C segment with a pan-India dealership network endeavouring to increase adoption of its […] Read more
TATA Power’s Q4 FY21 Results: Revenues Jump 50% Updated On Fri, May 14th, 2021 by Saurenergy Mumbai-based electric utility company Tata Power Limited released its financial results for the fourth quarter of FY21 ended March 31, 2021, announcing a marginal rise of one per cent in consolidated net profit at Rs 481.21 crore (Rs 474.70 crore in the year-ago period), due to saving in finance cost offset by an exceptional gain […] Read more
Electrical Engineer- LT/HT system installation and Photo Voltaic Updated On Thu, Apr 8th, 2021 by Saurenergy Responsibilities: Design including Technology Selection, System Configuration, Electrical Connection, Distribution and Control Systems, Power Conditioning Systems for Photo Voltaic power plant Responsible for complete project management through the installation, testing and commissioning of the system. Design, Erection, Commissioning and Maintenance of Photo Voltaic Power Plants Working with the company‘s engineers and program managers to ensure […] Read more
At ₹3.85, CERC Approves 7% Hike in APPC for Open Access Solar in 2020-21 Updated On Thu, Apr 8th, 2021 by Saurenergy In its order notified last week, the Central Electricity Regulatory Commission (CERC) has set the national Average Power Purchase Cost (APPC) for open access at ₹3.85/kWh. This implies that for wind or solar generators that are regional entities and selling power under open access, which is not accounted for RPO compliance of obligated entities, and […] Read more
Tata Power Solar Doubles PV Manufacturing Capacity to 1.1 GW Updated On Wed, Apr 7th, 2021 by Saurenergy Tata Power Solar has announced an expansion of its manufacturing facility in Bengaluru, taking the total production capacity of cells and modules to 1.1 GW Tata Power Solar Systems Limited, one of India’s largest integrated solar companies and a wholly-owned subsidiary of Tata Power, has announced a significant expansion of its state-of-the-art manufacturing facility in […] Read more
Civil Engineer Updated On Tue, Apr 6th, 2021 by Saurenergy Responsibilities: To design and construct sub stations, transformer bays and switchyards, their inspection and inspection report writing, & preparation of plans, structural analysis and design, finite element modeling and analysis of special structures, foundation and retaining structure design, quantity-cost estimates. Site Execution of civil work within the time frame and within the Budget. Estimation and […] Read more
Admin Executive Updated On Wed, Mar 31st, 2021 by Saurenergy Qualification: Qualified graduates can apply for this position Experience: 1+ Years Responsibilities: Responsible for day to day administrative activities of the executive office such as – Transport, Servicing of card boards, Procurement, Documentation Assisting Accounts Team with Cash Withdrawals, RTGS, DDs, Documentation Going out with engineers for surveys if required Doing all the works given by […] Read more
No way out for Stranded Thermal Assets in India, Amid RE Push : IEEFA Updated On Wed, Mar 31st, 2021 by Saurenergy India’s 40 GW of stressed and stranded thermal power assets, identified by a parliamentary committee in March 2018, still linger on – most of them without any feasible resolution. India’s 40 gigawatts (GW) of stressed and stranded thermal power assets, identified by a special parliamentary committee in March 2018, still linger on – most of […] Read more