Maharashtra: NTPC Looks For Land To Build 600 MW Solar Project Updated On Mon, Oct 21st, 2024 by Saurenergy NTPC Limited has now issued a tender seeking land to develop 600 MW of solar projects in the Dhule region of Maharashtra and the successful evacuation of the clean power from the region. The power behemoth has invited the bids from bidder with prior experience in execution for grid connected Solar PV Projects/Solar Parks or […] Read more
NVVN Plans To Boost Solar At NTPC Ramagundam, Simhadri Updated On Thu, Oct 17th, 2024 by Saurenergy NTPC Vidyut Vyapar Nigam LImited (NVVN) has now issued a tender with an aim to boost the growth of solar on the premises of NTPC Ramagundam and NTPC Simhadri. The subsidiary of the NTPC Group plans to boost the growth of rooftop solar and ground-mounted solar projects at these sites. As per the NVVN plan, […] Read more
NTPC-Ramagundam Invites Bids To Build 100MW/400MWh BESS Updated On Mon, Oct 14th, 2024 by Saurenergy NTPC-Ramagundam in Telangana has issued a tender to build grid-connected 100MW/400MW Battery Energy Storage System (BESS). Through this tender, NTPC has planned to develop renewable energy solutions and support the same through energy storage. The deadline for bid submissions is set for November 6, 2024. The successful bidder will be responsible for developing, installing, and […] Read more
Rays Power Infra To Build VRFB Storage For NTPC Updated On Mon, Sep 30th, 2024 by Saurenergy In a key milestone for flow batteries in India, Rays power Infra has secured an order for the 600KW / 3000KWh Vanadium Redox Flow Battery system from NTPC Limited . NTPC had issued the tender for the storage system back in June this year, to meet the power needs of NTPC Technology Research Alliance (NETRA). […] Read more
Khavda: Zetwerk Gets 1515 MW Module Contract From NTPC To Supply PV Modules Updated On Thu, Sep 26th, 2024 by Saurenergy Bengaluru based Contract manufacturing marketplace Zetwerk has received a second, major contract from NTPC Renewables to supply 1515 MWp of ALMM-compliant solar PV modules for the 1200 MW Khavda Solar project in Gujarat. Zetwerk has bagged this order which includes mandatory spares, for the 1200 MW Khavda Solar project in Gujarat. The company said it […] Read more
Delectrik Wins 3 MWh Battery Energy Storage Project From NTPC Updated On Tue, Sep 24th, 2024 by Saurenergy Gurugram-based Delectrik Systems, a flow battery OEM, won a tender from NTPC for its NETRA division (NTPC Energy Technology Research Alliance) to deploy a 3 MWh Vanadium Redox Flow Battery (VRFB) based Battery Energy Storage System (BESS). NETRA is deploying this VRFB as long-duration energy storage (LDES) to augment the storage capacity of its microgrid […] Read more
Apraava Energy Secures 300 MW Solar Project From NTPC In Rajasthan Updated On Thu, Sep 12th, 2024 by Saurenergy Apraava Energy, today signed a Power Purchase Agreement (PPA) for a 300 MW interstate transmission system (ISTS) connected solar energy project with NTPC Limited in Rajasthan. The Mumbai-based integrated energy solutions provider project in Rajasthan is expected to be completed within 24 months. Apraava secured this project through an e-reverse auction mechanism at a tariff […] Read more
Suzlon Announces India’s Largest Wind Order Of 1.16 GW From NTPC Updated On Mon, Sep 9th, 2024 by Saurenergy After reporting strong FY 25 Q1 results, Suzlon Group today announced bagging India’s largest wind energy order from NTPC Green Energy Limited (the renewables arm of India’s largest energy conglomerate NTPC Limited) for 1166 MW. Suzlon will install a total of 370 wind turbine generators (WTGs) of S144 equipped with a Hybrid Lattice Tubular (HLT) […] Read more
NTPC Issues 1.2 GW Hybrid Tender With 600 MW Greenshoe Option Updated On Fri, Aug 30th, 2024 by Saurenergy NTPC has released a tender to select hybrid power generators for the supply of 1.2 GW of power from inter-state (ISTS)-connected wind-solar hybrid power projects anywhere in India. This project has a greenshoe option for an additional capacity of up to 600 MW on a Build-Own-Operate (BOO) basis with 20th of September set as the […] Read more