Amara Raja To Set Up Green Hydrogen Fueling Station In Leh for NTPC Updated On Wed, Jun 15th, 2022 by Saurenergy Amara Raja Power Systems has announced that the company has received an order from the state owned National Thermal Power Corporation (NTPC) for the development of the first green hydrogen fuelling station on the heights of Leh in Ladakh region. Amara Raja Power Systems is a part of the $1.3 billion strong Amara Raja Group. […] Read more
NTPC Sets In Motion Commercial Operations Of 15 MW Kawas Solar Updated On Wed, Jun 15th, 2022 by Saurenergy State-owned NTPC has started commercial operations of its 15 MW solar capacity at Kawas Solar Project in Gujarat on June 15. A statement released by the company reads, “…second part capacity of 15 MW out of 56 MW Kawas Solar PV Project at Kawas is declared on commercial operation with effect from 00:00 hours of […] Read more
NTPC Renewable Calls for Wind Energy Bids For 100 MW Project in Madhya Pradesh Updated On Tue, May 31st, 2022 by Saurenergy NTPC Renewable Energy, the renewable arm of NTPC has invited bidders for a 100 MW wind energy project in Madhya Pradesh. The tender document identifies the scope as detailed design, engineering, micro-siting, manufacture, supply, erection, testing, and commissioning of wind energy projects with a cumulative capacity of 100 MW. The project/s will be linked to […] Read more
SECI Announces 1.2 GW Wind Auction Results, NTPC Lowest Bidder at Rs 2.89/unit Updated On Wed, May 25th, 2022 by Saurenergy Solar Energy Corporation of India (SECI) has announced the winners of the 1.2 GW Wind Energy Projects’ auctions or Tranche XII for interstate transmission connected wind projects. Even as NTPC bid at Rs 2.89/unit, for its 200 MW bid, it was Halvad Renewables Pvt Ltd that won 300 MW at a price of Rs 2.93 along […] Read more
NTPC commissions 35 MW Floating Solar Project in Kayamkulam Updated On Mon, May 23rd, 2022 by Saurenergy State owned power producer NTPC has announced that consequent upon successful commissioning, second part capacity of 35 MW out of 92 MW Kayamkulam Floating Solar PV Project at Kayamkulam, Kerala, is declared on commercial operation w.e.f. 06:00 Hrs. of 19 May 2022. As per the announcement, the first part capacity of 22 MW was already […] Read more
NTPC Q4, Fy 21-22 Results-Strong Show, But Slow Going On Renewable Capacity Plans Updated On Sat, May 21st, 2022 by Saurenergy The Country’s largest power generator- NTPC Ltd., with a present group installed capacity of 68,982 MW, declared the financial results for FY22 on 20 May 2022. NTPC Group generated 361 Billion Units and recorded highest ever annual generation in FY22 as compared to 314 Billion Units in FY21, an increase of ~15%. NTPC’s standalone gross […] Read more
NTPC beings commercial operation of 20 MW solar capacity at Kawas Updated On Mon, May 16th, 2022 by Saurenergy National Thermal Power Corporation (NTPC), the state owned power producer – has announced that the first part capacity of 20 MW of the Kawas Solar Power Project has begun the commercial operation. The entire solar project is of 56 MW capacity. It is located at Hazira, Surat district of Gujarat. In a regulatory filing with […] Read more
Jakson Group Adds O&M Wins worth 255 MW From NTPC To Kitty Updated On Fri, May 13th, 2022 by Saurenergy Following on from the award of O&M for NTPC’s 260 MW solar plant at Bhadla in Rajasthan, the Jakson Group has won bids for comprehensive Operation and Maintenance (O&M) for a 250 MWp Solar PV Project in Ananthapuram, Andhra Pradesh and a 5 MWp Solar PV Plant in Andaman & Nicobar Islands. NTPC invited these […] Read more
NTPC floats O&M tender for 5 blocks of 250 MWp Mandsaur solar plant Updated On Wed, May 11th, 2022 by Saurenergy Power utility NTPC Limited has invited bids for the comprehensive Operation and Maintenance (O&M) of 5 blocks (50*5) of its 250 MWp Mandsaur solar PV plant for 3 years. NTPC invites these online bids on Single Stage Two Envelope Bidding basis (Envelope-I: Techno-commercial Bid & Envelope-II: Price Bid) from eligible bidders. Key details of the tender […] Read more