NTPC commissions 35 MW Floating Solar Project in Kayamkulam Updated On Mon, May 23rd, 2022 by Saurenergy State owned power producer NTPC has announced that consequent upon successful commissioning, second part capacity of 35 MW out of 92 MW Kayamkulam Floating Solar PV Project at Kayamkulam, Kerala, is declared on commercial operation w.e.f. 06:00 Hrs. of 19 May 2022. As per the announcement, the first part capacity of 22 MW was already […] Read more
NTPC Q4, Fy 21-22 Results-Strong Show, But Slow Going On Renewable Capacity Plans Updated On Sat, May 21st, 2022 by Saurenergy The Country’s largest power generator- NTPC Ltd., with a present group installed capacity of 68,982 MW, declared the financial results for FY22 on 20 May 2022. NTPC Group generated 361 Billion Units and recorded highest ever annual generation in FY22 as compared to 314 Billion Units in FY21, an increase of ~15%. NTPC’s standalone gross […] Read more
NTPC beings commercial operation of 20 MW solar capacity at Kawas Updated On Mon, May 16th, 2022 by Saurenergy National Thermal Power Corporation (NTPC), the state owned power producer – has announced that the first part capacity of 20 MW of the Kawas Solar Power Project has begun the commercial operation. The entire solar project is of 56 MW capacity. It is located at Hazira, Surat district of Gujarat. In a regulatory filing with […] Read more
Jakson Group Adds O&M Wins worth 255 MW From NTPC To Kitty Updated On Fri, May 13th, 2022 by Saurenergy Following on from the award of O&M for NTPC’s 260 MW solar plant at Bhadla in Rajasthan, the Jakson Group has won bids for comprehensive Operation and Maintenance (O&M) for a 250 MWp Solar PV Project in Ananthapuram, Andhra Pradesh and a 5 MWp Solar PV Plant in Andaman & Nicobar Islands. NTPC invited these […] Read more
NTPC floats O&M tender for 5 blocks of 250 MWp Mandsaur solar plant Updated On Wed, May 11th, 2022 by Saurenergy Power utility NTPC Limited has invited bids for the comprehensive Operation and Maintenance (O&M) of 5 blocks (50*5) of its 250 MWp Mandsaur solar PV plant for 3 years. NTPC invites these online bids on Single Stage Two Envelope Bidding basis (Envelope-I: Techno-commercial Bid & Envelope-II: Price Bid) from eligible bidders. Key details of the tender […] Read more
NTPC Hopes To Raise Rs 2,000 crore From Stake Sale In NGEL Updated On Thu, May 5th, 2022 by Saurenergy State owned National Thermal Power Corporation (NTPC) is planning to sell a stake in its subsidiary NTPC Green Energy (NGEL) that was formed to develop renewable energy projects. NTPC is expected to raise about Rs 2,000 crore from the sale of the stake. The corporation has earlier indicated that the sale was likely by October […] Read more
Jakson Group wins bid for O&M of NTPC Bhadla Solar Power Plant Updated On Fri, Apr 29th, 2022 by Saurenergy To strengthen its legacy as an energy solution provider, Jakson Group, one of the India’s fastest-growing energy companies, won a bid for comprehensive Operation and Maintenance (O&M) for 260 MW Bhadla Solar PV Plant located at Bhadla Solar Park in BAP, Rajasthan. Jakson Group will have the responsibility to continuously monitor the site for all […] Read more
NTPC, Energy Vault sign MoU for gravity-based energy storage tech Updated On Wed, Apr 27th, 2022 by Saurenergy NTPC Limited, the largest power generating utility in India, has announced that it has signed a Memorandum of Understanding (MoU) with Energy Vault Holdings, Inc. The objective of the MoU is to collaborate and formalize a long-term strategic partnership for the deployment of Energy Vault’s EVx™ gravity-based energy storage technology and software solutions based on […] Read more
NTPC invites bids from potential partners For Future Green Hydrogen Tenders Updated On Tue, Apr 26th, 2022 by Saurenergy NTPC Renewable Energy has recently invited online bids from electrolyser technology providers to help the employer bag the upcoming tenders on green hydrogen. The tender reads further, “This tender intends to select electrolyser technology provider(s) for a period of two years for polymer electrolyte membrane (PEM) technology of 400 megawatts (MW) and non-PEM technology of […] Read more