NTPC Likely To Add 5,000 MW Of Renewable Energy Capacities Annually Updated On Mon, Jun 5th, 2023 by Saurenergy India’s largest power sector PSU (Public Sector Utility)-NTPC Limited, is likely to add around 4,000 MW to 5,000 MW of renewable energy annually to achieve its ambitious clean energy target. The PSU has targeted adding up to 60 Gigawatt (GW) of installed renewable power capacity by 2032. However, in the short term, the power behemoth has planned […] Read more
NTPC Partners With Ohmium For PEM Electrolyzers To Boost Green Hydrogen Production Updated On Fri, Jun 2nd, 2023 by Saurenergy NTPC Renewable Energy Limited (NREL), the green arm of NTPC, has now chosen leading Green Hydrogen company Ohmium as its Proton Exchange Membrane (PEM) electrolyzer partner. The agreement will likely boost the Green Hydrogen production plan of the NTPC, India’s largest government-owned power producer. Ohmium said the agreement is valid for two years until May […] Read more
NTPC Green, UPRVUNL Sign Pact To Develop Floating Solar, RE Parks Updated On Thu, Jun 1st, 2023 by Saurenergy NTPC Green Energy Limited recently signed a pact with the Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (UPRVUNL) to develop renewable energy parks, floating solar, and other solar projects in Uttar Pradesh through a collaborative approach. The green arm of the NTPC said that the move would likely boost the company to facilitate the Indian […] Read more
NTPC Issues Tender for O&M of Solar Plants up to 50 MW Updated On Tue, May 23rd, 2023 by Saurenergy The National Thermal Power Corporation Limited (NTPC) has issued a tender for outsourcing its operation and maintenance of solar power plants up to 50 Megawatt (MW). The leading power producer of India has kept the closing date for the bid to June 29, 2023. The bidders can submit their bids by June 29, 2023. It […] Read more
NTPC Reports Highest Ever Annual Generation, 32% Surge In Income In FY23 Updated On Fri, May 19th, 2023 by Saurenergy The National Thermal Power Corporation of India (NTPC) today announced its Q4 and FY23 Financial Results. The leading power generator of the country claimed that during FY23, it reported the highest-ever annual generation of 399 Billion Units (BU) compared to 361 BU in FY22, registering a growth of around 11 percent. The audited results of […] Read more
NTPC Eyes 130 MW Floating Solar in Tripura Updated On Tue, May 16th, 2023 by Saurenergy National Thermal Power Corporation (NTPC) said that it will be conducting a feasibility study for a 130 MW floating solar power plant on Dumbur Lake that falls in Gomati district of Tripura. In the current case, Tripura Renewable Energy Development Agency (TREDA) has inked an MoU with NTPC for the feasibility study. As part of […] Read more
Gensol Wins NTPC NVVN’s 0.5 MW Solar PV Project at IIM Udaipur Updated On Mon, May 1st, 2023 by Saurenergy Gensol Engineering Private Limited has bagged a 0.5 MW solar project tender floated by NTPC Vidyut Vyapar Nigam Ltd. Thr project is for the development of 0.5 MW (AC) grid connected ground mounted solar PV project at IIM-Udaipur Rajasthan under net-metering. The other bidders that participated in the competitive bidding included Rajasthan Electronics and Instruments […] Read more
NTPC Arm Bags 500 MW of RE Project from REMCL; Project Nine Renewable Power & Sprng Akshya Urja Other Winners Updated On Fri, Apr 28th, 2023 by Saurenergy REMCL (Renewable Energy Management Company) had declared the results for a 1000 MW renewable energy project. Of the 1000 MW capacity, 900 MW has been tendered. Energy conglomerate NTPC has announced that its arm NTPC Renewable Energy (NTPC-REL) has won a 500 MW renewable energy round-the-clock (RE-RTC) project of the tendered capacity. Sprng Akshya Urja […] Read more
NTPC Floats Tender For 9,000 MWH Of ISTS-Connected Energy Storage Systems Updated On Thu, Apr 20th, 2023 by Saurenergy The National Thermal Power Corporation Renewable Energy Limited (NTPC REL) has now invited online bids from developers for a 9,000 Megawatt-Hour (MWH) of Inter-State Transmission System (ISTS)-connected energy storage solution. The tender said the plant(s) could be based anywhere in India. The minimum capacity of the same should be 1,500 MW, the tender said. NTPC […] Read more