Telangana Discovers BESS Tariff At ₹2.40 Lac/MW/Month Updated On Tue, Mar 25th, 2025 by Saurenergy Telangana has awarded its 500 MWh with a standalone Battery Energy Storage System (BESS) project tender at a tariff in the range of Rs. 2.40-2.45 lakh/MW/month. This is one of the first tenders released by Telangana Genco (TGGENCO) for a 500 MWh (250 MW x 2 hours) project. TGGENCO issued the tender with Viability Gap […] Read more
India’s Wind Energy Capacity Touches 48.5 GW Updated On Mon, Mar 24th, 2025 by Saurenergy India’s cumulative wind energy capacity has reached 48.5 GW, according to the latest data from the Central Electricity Authority (CEA). The CEA’s most recent monthly report highlighted the addition of new wind energy capacities, indicating steady growth in the sector. As per the report, the country added 223 MW of new wind energy capacity in […] Read more
NTPC Secures Highest VGF Support For CPSU Scheme Updated On Thu, Mar 13th, 2025 by Saurenergy NTPC has emerged as the largest beneficiary of the central government grant under the Central Public Sector Undertaking (CPSU) Scheme Phase-II (Government Producer Scheme). Latest data shared by the government before the Rajya Sabha revealed the levels of allocations given to different CPSUs. The government aids these CPSUs for setting up grid-connected Solar Photovoltaic (PV) […] Read more
Ladakh: Group Surya Wins Solar-Hydrogen Microgrid Project Updated On Tue, Mar 11th, 2025 by Saurenergy Group Surya’s subsidiary, Surya International, has secured an EPC package to develop a 200 kW Solar-Hydrogen BESS-Based Microgrid in Chushul, Ladakh. NTPC Renewable Energy Limited (NTPC REL), a subsidiary of NTPC Ltd., awarded the project to the Odisha-based company. NTPC and the Indian Army launched this initiative to utilize green hydrogen for round-the-clock (RTC) power […] Read more
Energy Storage Lead Updated On Thu, Mar 6th, 2025 by Saurenergy The role shall focuses on developing cost models and designing solutions for BESS and PSP projects, particularly for renewable energy tenders (FDRE, RTC) and C&I consumers. Responsibilities include bottom-up costing, technology evaluation and LCOE/LCOS analysis for various storage durations and applications. The role involves structuring storage solutions for C&I clients under different models (Open Access, […] Read more
ReNew, Enfinity, Serentica Among Winners of SJVN’s FDRE tender Updated On Sat, Mar 1st, 2025 by Saurenergy SJVN has announced the winners of its 1.2 GW Firm and Dispatchable Energy (FDRE) tender. As per the tender announcement, SJVN awarded the bids to ReNew Solar Power, EG Energy Development (Enfinity Global), Dineshchandra R Agrawal Infracon, Serentica Renewables India, and Tata Power Renewable Energy to develop 1,200 MW ISTS-connected projects for firm and dispatchable […] Read more
JSW Energy Wins 125 MW/500 MWh BESS Tender From SECI At ₹441,000/MW/Month Updated On Thu, Feb 27th, 2025 by Saurenergy JSW Energy has recently secured a 125 MW/500 MWh standalone battery energy storage system (BESS) tender from the Solar Energy Corporation of India (SECI). JSW won the tender at ₹441,000/MW/month. SECI floated this tender in December 2024 and declared it within two months. As per the tender, SECI, after receiving interest from the Kerala State […] Read more
Assam DISCOM Issues Tender For 134 MW Rooftop Solar Projects Updated On Thu, Feb 20th, 2025 by Saurenergy Assam Discom, Assam Power Distribution Company (APDCL) has recently released a tender to develop 134 MW Grid Connected rooftop solar (RTS) projects (without battery storage) on different Government Buildings under PM Surya Ghar: Muft Bijli Yojana. It is accepting bids till 11th March 2025 APDCL’s latest tender consists of three packages, it mentioned the project […] Read more
CERC Adopts tariff For SECI’s 1200 MW Wind Solar Hybrid Projects Updated On Thu, Feb 20th, 2025 by Saurenergy In an order dated February 18, the Central Electricity Regulatory Commission has adopted the proposed tariffs for SECI’s 1200 MW Hybrid projects comprising wind and solar energy under Tranche VIII. SECI had issued the letter of awards to the winning bidders on June 20, 2024. The projects will now await the signing of formal PPAs, […] Read more