Restrictive Banking Provisions aren’t Helping Renewable Adoption in India Updated On Mon, Sep 28th, 2020 by Saurenergy After restrictive net metering regulations and withdrawal of waivers for open access renewable projects, regulators are now restricting banking facilities. Banking is important as it provides renewable developers a mechanism to utilise their excess generation and avail financial benefits in some cases, states an analyst by JMK Research. In the last year, some renewable energy-rich […] Read more
MSEDCL Continues To Write the Rulebook On Killing Solar Rooftop Updated On Fri, Sep 25th, 2020 by Saurenergy The Maharashtra State Energy Distribution Company Limited continues to find new ways to rile up solar stakeholders. Their latest effort, or ‘non effort’ relates to the piffling demand for central solar subsidy worth Rs 3 crores, for just 25 MW, when the potential in the state according to most experts is easily over 1000 MW. […] Read more
“Draconian” Rule in Proposed Changes For Consumers To Hit Solar Sector: EPC Firms Updated On Fri, Sep 18th, 2020 by Saurenergy The Ministry of Power has recently issued the draft rules providing for the ‘Rights of Electricity Consumers’ for the very first time. However, one provision included in the draft rules has managed to roil up smaller solar EPC companies at a key proposal within the rules. The power ministry stated that “having provided access to […] Read more
REIL Tenders for Rooftop & Small Solar Plants Across Uttarakhand Updated On Fri, Sep 4th, 2020 by Saurenergy REIL has issued a tender for rooftop and small solar projects of capacity between 1 kWp and 500 kWp across 9 sites in Uttarakhand. Rajasthan Electronics & Instruments Limited (REIL) has issued a tender, inviting bids from eligible vendors for commissioning of rooftop and small solar projects of capacity between 1 kWp and 500 kWp across […] Read more
Maharashtra has Achieved 9.7 GW of its 22 GW by 2022 RE Target Updated On Mon, Aug 10th, 2020 by Saurenergy As of June 2020, Maharashtra has an installed renewable energy capacity of 9.7 GW, which is 44 percent of its 2022 target of 22 GW. Maharashtra has renewable energy potential of 75 GW, which is 8.3 percent of the country’s total potential. As per the state’s National Electricity Plan 2018, Maharashtra has a renewable energy […] Read more
‘Surge ‘in Residential Rooftop Solar in NCR: The Alternative Reality Of Delhi Discoms Updated On Tue, Aug 4th, 2020 by Saurenergy Discoms in Delhi claim they are witnessing a ‘surge’ in the residential rooftop solar segment, with more than ‘1900 net metering’ connections installed in recent years. Irony just found a new supporter. The Delhi discoms. According to them, barely 1900 solar rooftop connections in the past three years count as a ‘surge’ in solar rooftop […] Read more
The same duties on imports of cells & modules are not going to serve the purpose: Prasoon Chaudhary Updated On Mon, Aug 3rd, 2020 by Saurenergy In a chat with Prasoon Chaudhary, Business Unit Head, Photovoltaic Solar Manufacturing at Pennar Industries Limited, we got his perspective on the many challenges the module side of the business faces today. After their success in the mounting structures business, the engineering goods firm is looking ahead to replicating the same level of success in […] Read more
MNRE Slashes Benchmark Costs for Rooftop Solar Installations Updated On Thu, Jul 23rd, 2020 by Saurenergy MNRE has issued a notification with the latest benchmark costs for the installation of new grid-connected rooftop solar PV systems in FY 2020-2021. The Ministry of New and Renewable Energy (MNRE) has issued a notification with the latest benchmark costs for the installation of new grid-connected rooftop solar PV systems for the present financial year […] Read more
Future of Residential Solar: Post Covid Period Updated On Thu, Jul 2nd, 2020 by Saurenergy Till Dec 2019, India was having 757 MW of cumulative installed solar capacity by the residential segment, out of 5440 MW of rooftop solar (RTS). As per Phase II of Grid connected RTS implementation plan by MNRE released in Aug 2019 last year, India has set for itself a modest and calculated target of 4GW […] Read more