Top 5 States Spearheading Rooftop Solar in India Updated On Thu, May 9th, 2024 by Saurenergy India has made strides in new solar capacity addition in the last few years. However, a considerable gap exists between rooftop solar (RTS) and utility-scale solar installations. Despite existing national and state-level schemes promoting rooftop solar, including the National Rooftop Scheme and state government subsidies, participation rates remained low. This is mostly because of the […] Read more
Pakistan A Step Closer To 1.3 GW Renewable Project Updated On Thu, May 9th, 2024 by Saurenergy Pakistan, where despite a horrendous power grid situation and ideal conditions for solar, renewable energy beyond Hydro has simply not been allowed to take root, might finally be moving towards a GW scale renewable project. The country’s grid has been paralysed with issues linked to its ‘circular debt’, leading to extended blackouts, and a stealthy […] Read more
Top 5 States In Rooftop Solar In India Updated On Wed, Apr 24th, 2024 by Saurenergy It is no secret now that even India has made strides in new solar capacity addition in the last few years, a considerable gap exists between rooftop solar (RTS) and utility-scale solar installations. The PM Suryaghar Muft Bijli Yojana might be the most ambitious scheme yet to reduce that gap, but its impact will probably […] Read more
Elin Energy Begins Solar Manufacturing Facility In US Updated On Tue, Apr 16th, 2024 by Saurenergy Elin Energy, the European PV panel maker, has announced the commissioning of its first manufacturing facility in the United States. Elin is currently leasing the site in Twinwood Business Park from Welcome Group, a Houston-based leader in single-tenant real estate development and property management. Production began on March 5. The facility will produce only modules. […] Read more
Pakistanis Take Matters In Their Own Hands With Rooftop Solar Boom Updated On Wed, Apr 10th, 2024 by Saurenergy Pakistan has been facing the dual challenge of rising electricity prices and an unreliable grid power supply for some time now. With electricity prices in key cities like Lahore nudging Rs 70/kW, and that too with unreliable supply, it has become only too apparent for many middle class and richer residents that they will need […] Read more
FIMER’s Made In India Inverters Shine In Key Indian PV Projects: KN Sreevatsa, MD Updated On Tue, Apr 9th, 2024 by Saurenergy 1.How was the year 2023 for FIMER in India In 2023, FIMER achieved a groundbreaking feat by securing its first major order of the year — a substantial 2.45 GW contract from a single client at a specific location in India. This was particularly significant as it involved the successful conclusion of the NTPC Phase […] Read more
Husk Power Plans To Commission More Mini-Grids In India: William Brent (CMO) Updated On Thu, Apr 4th, 2024 by Saurenergy How did the journey of Husk Power Systems start? Husk Power’s journey started around 2008 with its co-founder, Manoj Sinha, and other like-minded people from Bihar. At that time, rural electrification was a major issue in India and states like Bihar. Husk came into the picture to ensure that the unserved communities in those areas […] Read more
MPERC Introduces Policy For Grid Interactive Renewable Energy System Updated On Wed, Apr 3rd, 2024 by Saurenergy Madhya Pradesh regulatory body Madhya Pradesh Electricity Regulatory Commission (MPERC) introduced general conditions for net metering, group net metering, and virtual net metering, through distributed licensees to eligible consumers on a first come first serve basis. The regulation extended to the whole of Madhya Pradesh and applied only to the Captive Power Plants (CPP) using […] Read more
DERC New Guidelines Lays Costs On Distributors For Under 11kV Project Updated On Wed, Mar 27th, 2024 by Saurenergy The Delhi Electricity Regulatory Commission (DERC) recently amended guidelines that is called Delhi Electricity Regulatory Commission (Group Net Metering and Virtual Net Metering for Renewable Energy) (Fifth Amendment) Guidelines, 2024. These guidelines are expected to come into effect from 1st April 2024 and remain in force till further amendments. The DERC’s recent notification amendment was […] Read more