PM-KUSUM (Comp A): Centre Allocates 5 GW Capacity To Rajasthan Updated On Fri, Jan 10th, 2025 by Saurenergy The Ministry of New and Renewable Energy (MNRE) has now ordered allocating an additional 5,000 MW capacity to Rajasthan under the PM Kusum (Component A) Scheme. Union Minister for New and Renewable Energy Prahlad Joshi allocated the additional quota to the state after receiving a representation from Rajasthan Chief Minister Bhajan Lal Sharma and a […] Read more
Senior Accountant Updated On Wed, Jan 8th, 2025 by Saurenergy Senior Accountant role responsible for all accounting and financial transactions. Should have a thorough knowledge of Indian GAAP, GST and Tax. Month End Reporting – Local Books Responsible for month journal entries and close process for Local Books Responsible for FAM Register for Local Books Preparation of IS and BS Comparative Analysis at Local Books […] Read more
Teerth Gopicon, Reliance Win SJVN’s 5.8 MW Rooftop Solar Bid Updated On Wed, Jan 8th, 2025 by Saurenergy SJVN has declared Teerth Gopicon and Reliance Industries as the winners of its 5,830 kW grid-connected solar project tender. The tender was floated under the PM Surya Ghar scheme. The tender for this project was released in September, and the results were declared within four months. According to the tender results, Teerth Gopicon secured 5,705 […] Read more
PM Surya Ghar: 6 Out Of 1736 Vendors In UP Rated A++ Updated On Mon, Dec 30th, 2024 by Saurenergy The Uttar Pradesh New and Renewable Energy Agency (UPNEDA) has released the draft list of empanelled rooftop solar vendors. The list also includes the ratings these vendors received on the National Rooftop Portal based on their installations. The final ratings for vendors will be published monthly, starting in January 2025. UPNEDA reports that the state […] Read more
Pune-Based EPC Firm GK Energy Limited Files DRHP for IPO Updated On Mon, Dec 16th, 2024 by Saurenergy GK Energy Limited has filed its Draft Red Herring Prospectus (DRHP) with the Securities and Exchange Board of India (SEBI). Pune-based company now plans to raise funds through an Initial Public Offering (IPO).GK Energy is a pure-play engineering, procurement and commissioning (EPC) provider of solar-powered agricultural water pump systems. The offer comprises direct-to-beneficiary sales and sales to […] Read more
Rooftop Solar: 81,188 Govt Buildings Potent To Generate 3 GW Updated On Thu, Dec 12th, 2024 by Saurenergy The latest data from the Ministry of New and Renewable Energy (MNRE) said that the installation of rooftop solar on identified government buildings could harness up to 3.1 GW of solar energy. Minister of State (MoS) of MNRE Sripad Yesso Naik said that the ministry has identified 81,188 such feasible government buildings where rooftop solar […] Read more
What Is The Cost Of A 3KW Rooftop Solar? Answer Lies On Firm Selection Updated On Mon, Dec 2nd, 2024 by Saurenergy India’s rooftop solar installations are accelerating. According to the latest data from the Ministry of New and Renewable Energy (MNRE), India’s rooftop solar capacity reached 14.44 GW by the end of October 2024. This growth can be attributed to factors such as increased subsidies, the introduction of automated Technical Feasibility Reports (TFRs), and a series […] Read more
Senior Engineer – Process Automation Updated On Mon, Dec 2nd, 2024 by Saurenergy Responsibilities:- The Senior Automation Engineer will provide technical and functional responsibility for Automation, control and safety system requirements and will work alongside other disciplines. Acts in Lead technical and supervisory roles in project definition, development, and execution Leads project sub – teams during system design and implementation Coordinates with project discipline and senior engineers to […] Read more
Fixed Tenure Engineers Updated On Mon, Nov 25th, 2024 by Saurenergy Bharat Electronics Limited, a Navaratna and India’s premier Professional Electronics Company requires the following Engineers for its Bangalore only Complex and other Project sites on Fixed Tenure basis for a period 05 Years (Extendable upto 02 Years): DETAILS OF POSTS, MINIMUM ELGIBILITY CRITERIA and PLACE OF POSTING:- Post Code Post Discipline / […] Read more