JinkoSolar’s Malaysia Plant 100% Renewable Powered Now Updated On Mon, Jun 20th, 2022 by Saurenergy In a welcome development, global module major Jinko Solar has ensured that it’s overseas plant at Malaysia is powered completely by renewable energy. That makes it the first overseas plant to be 100% renewable powered. Jinko Solar was the first company to establish a “vertically integrated” production capacity from silicon material processing to wafer, cell […] Read more
NIWE E-tender for Hybrid Roof-Top 100 kW at Chennai, Tamil Nadu Updated On Fri, Jun 17th, 2022 by Saurenergy An independent R&D institution of MNRE, the National Institute of Wind Energy (NIWE) has floated a 100 KW tender for Hybrid Roof-Top at Chennai in Tamil Nadu. All the solar PV modules should be Monocrystalline (PERC) modules. Bids of this 100 Kw project will be opened on July 05, 2022, at 04:30 PM and the […] Read more
Vietnam’s Boviet Solar Confirms 255 MW Solar Capacity Win in the United States Updated On Tue, Jun 14th, 2022 by Saurenergy Vietnam-headquartered Boviet Solar has signed a contract with a renewable energy provider to supply 255 MW of PV Modules for a utility-scale solar project in the United States. It has a 1.5 GW Monocrystalline PERC Cell & Module Manufacturing capacity. Boviet Solar makes monocrystalline wafer technology integrated with PERC, half-cut, multi-busbar, Monofacial, and Bifacial PV […] Read more
Tata Power commissions 100 MW solar project in Maharashtra Updated On Thu, May 26th, 2022 by Saurenergy Tata Power Renewable Energy Ltd has announced that it commissioned the 100 MW solar power project for Maharashtra State Electricity Distribution Company Limited (MSEDCL) in Maharashtra. Tata Power claims that the installation comprises over 4,11,900 numbers of monocrystalline PV modules and is expected to reduce around 234 million tons of CO2 annually. The official statement […] Read more
Rajasthan Invites Bids To Procure Solar Cells Of 5.64 W Updated On Mon, May 16th, 2022 by Saurenergy Rajasthan Electronics and Instruments (REIL) has invited bids to procure 180,000 monocrystalline or multicrystalline solar cells of 5.64 W capacity. REIL uploaded on its website the tender on May 10 mentioning that the last date to submit the bids is May 31, 2022. Bids will be opened on the same day. The specification of cells […] Read more
JinkoSolar’s High-efficiency N-Type Cell Continues To Set Efficiency Records at 25.7% Now Updated On Thu, Apr 28th, 2022 by Saurenergy JinkoSolar Holding Co., Ltd. (Jinko Solar), one of the largest and most innovative solar module manufacturers in the world has announced that it has achieved a major technical breakthrough for its 182 mm high-efficiency N-type monocrystalline silicon solar cell. JinkoSolar has set a new world record again with the maximum solar conversion efficiency of 25.7% […] Read more
Polysilicon Prices Rising Steadily in China, Will Continue in April too: Silicon China Updated On Mon, Apr 11th, 2022 by Saurenergy The prices of raw silicon materials are on an unabated rise in China, signifying that the solar power projects across the world will be impacted as the solar PV manufacturing is getting dearer. Industry body Silicon China has released the latest silicon materials’ transaction prices. Silicon China is a part of China Nonferrous Metal Industry […] Read more
Rajasthan at 2nd position in achieving rooftop solar power target Updated On Fri, Apr 8th, 2022 by Saurenergy Rajasthan is at No. 2 position in achieving the target for implementing rooftop solar power projects in the country, according to recent media reports. Gujarat, which was given a target of 3200 MW, has achieved 54%, while Rajasthan has set up 33% of the allocated 2300 MW capacity. In terms of capacity by February 2022, […] Read more
Tata Power Solar Commissions 160MW AC solar project in Rajasthan Updated On Wed, Apr 6th, 2022 by Saurenergy Tata Power Solar, a major integrated solar company and a wholly-owned subsidiary of Tata Power, has commissioned a 160MW AC solar project at Jetstar, Rajasthan. Approximately 6,75,000 numbers of monocrystalline PV modules were used in this installation and it will produce 387MUs of energy per year, an official statement said. “The Jetstar project was completed […] Read more