SUBSCRIBE NEWS LETTER

mnre

CERC Issues Draft Amendments for ISTS Connectivity of RE Projects

CERC has issued the draft amendments for its regulations and procedure for granting of connectivity to projects based on RE sources to the ISTS. The Central Electricity Regulatory Commission (CERC) has issued the draft amendments for its regulations and procedure for granting of connectivity to projects based on renewable energy (RE) sources to inter-State transmission […]

Read more

3 Firms Pitch for Equalisation Levy on Solar Equipment Supplies From SEZs

A group of three domestic solar energy firms has pitched for an equalisation levy on solar equipment supplies from SEZs for domestic use A group of three domestic solar energy firms has pitched for an equalisation levy on solar equipment supplies from special economic zones (SEZs) for domestic use, so as to bring them at […]

Read more

Explaining India’s 175 GW Renewables Target. The Big Change Making It Possible

Over the last few months, Mr. R.K Singh, the Minister of State (Independent Charge) of the Ministry of Power, Minister of State (Independent Charge) of the Ministry of New and Renewable Energy and Minister of State in the Ministry of Skill Development and Entrepreneurship, Government of India, has faced what must seem like a tiring […]

Read more

CEL Tenders for Supply of 2 Million Multi-Crystalline Solar Cells Again

Central Electronics Limited (CEL) has once again issued its tender, inviting bids, for the supply of 2 million multi-crystalline solar cells. Central Electronics Limited (CEL) has once again issued its tender for the supply of 2 million multi-crystalline solar cells. As per the tender, the acceptance criteria for the solar cells will include – PERC […]

Read more

4 Winners in NTPC’s 1.2 GW Solar Tender, Winning Bid at Rs 2.43/kWh

NTPC Ltd has concluded the e-reverse auction for its 1.2 GW solar tender awarding capacity to 4 winners in O2 Power, Tata Power, Azure Power, and AMP Energy NTPC Ltd has concluded the e-reverse auction for its tender for the selection of solar power developers for setting up 1.2 GW ISTS-Connected solar PV power projects […]

Read more

MoP Extends ISTS Charges Waiver for Solar & Wind Projects Until 2023

MoP has extended the waiver of ISTS charges and losses on the supply of power generated from solar and wind power projects until June 30, 2023. The Ministry of Power (MoP) has notified that it has extended the waiver of inter-state transmission system (ISTS) charges and losses on the supply of power generated from solar and wind […]

Read more

Slowdown in Power Generation Decline Seen as a Sign of Recovery

The rate of decline in power generation in the past few months have slowed down in July, this slowdown is being seen as a sign of recovery. According to data made available by government resources, the rate of decline in power generation in the past few months has slowed down in July. This slowdown is […]

Read more

SECI to Conduct a 2nd Pre-Bid Meeting for Solar + Storage Tender in Ladakh

SECI has notified that it will be conducting a second pre-bid meeting for its tender for setting up of 14 MW solar plants along with 42 MWh BESS in Ladakh The Solar Energy Corporation of India (SECI) has notified that it will be conducting a second pre-bid meeting for its tender for the selection of […]

Read more

RERC Increases Capacity by 400 MW under KUSUM Yojana

In Rajasthan, Solar PV Projects Totaling 725 MW will be Installed now, under Component-A of the KUSUM Yojana The Rajasthan Electricity Regulatory Commission (RERC) has increased the capacity of solar PV projects to be installed in Rajasthan under Component-A of the Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyaan (KUSUM) Yojana by 400 MW. Rajasthan […]

Read more
      SUBSCRIBE NEWS LETTER
Scroll