Gautam Solar Installs Solar Pumps at 1000 Different Locations for Farmers in Haryana Updated On Tue, May 4th, 2021 by Saurenergy To reduce farmers’ reliance on diesel-based generators and make it easier for them to access electricity, Gautam Solar, one of India’s leading solar manufacturers, has installed solar pumps of 10 HP capacity at 1000 different locations in Haryana under the Pradhan Mantri Kusum Yojana. The government has set a target of installing 15,000 standalone solar […] Read more
PLI Scheme for Manufacturing of High Efficiency PV Modules a Positive for Domestic OEMs: ICRA Updated On Tue, May 4th, 2021 by Saurenergy The Ministry of New & Renewable Energy (MNRE) has notified the guidelines for the Production- Linked Incentive (PLI) scheme to promote the domestic manufacturing of high-efficiency solar modules and thereby reduce dependence on imports in the solar power sector. The scheme has been approved with a financial outlay of Rs. 4500-crore over a period of […] Read more
Guidelines Issued for PLI Scheme for Solar Modules; IREDA to be Implementing Agency Updated On Mon, May 3rd, 2021 by Saurenergy MNRE has issued the guidelines for the implementation of the PLI scheme for high-efficiency solar PV modules. The Ministry of New and Renewable Energy (MNRE) in a ministry wide notification has announced the sanction of the President for implementation of the Production Linked Incentive (PLI) scheme ‘National Programme on High-Efficiency Solar PV Modules’ for achieving […] Read more
With 25% Renewable Target for 2025, Solar In China Has a Smooth Run Ahead Updated On Tue, Apr 20th, 2021 by Saurenergy China’s national energy regulator NEA has released a consultation paper where it aims to raise the share of wind & Solar power in total power consumption to 11% in 2021 and 16.5% in 2025. Their combined share in 2020 was 9.7%. as we have reported earlier, combined with the long term target to 40 percent […] Read more
Project Manager – Solar Projects Updated On Sat, Apr 17th, 2021 by Saurenergy The Project Manager will take complete ownership of all projects to ensure LCOE and maximization of yields. Artha being a RESCO developer, expects this role holder to also effectively manage the O&M activities. Detailed attention must be given to adherence to MNRE standards and health and safety protocols. Needless to say, the Project Manager will […] Read more
Solar Crosses 40 GW Mark in India, Renewable Capacity at 94.43 GW Updated On Fri, Apr 16th, 2021 by Saurenergy MNRE in its monthly summary to the cabinet for March 2021 has revealed that the installed solar capacity in India has crossed the 40 GW mark The Ministry of New and Renewable Energy (MNRE) in its monthly summary to the cabinet for the month of March 2021 has revealed that the installed and operational solar […] Read more
CSC & Tata Power to set up 10,000 Solar Microgrids Across Rural India Updated On Fri, Apr 16th, 2021 by Saurenergy CSC has announced a collaboration with Tata Power to set up solar-powered microgrids and water pumps in rural areas across India. The government’s e-governance services arm CSC has announced a collaboration with Tata Power to set up solar-powered microgrids and water pumps in rural areas across the country. To begin with, Tata Power has proposed to set up […] Read more
Regulatory Affairs Expert (Renewables)(m/f/d) Updated On Thu, Apr 15th, 2021 by Saurenergy Responsibilities: Drafting and filing of Petitions Hearing & representations Tariff calculation PPA vetting Statutory clearances & compliance Strategic Planning & Management Liaison & Coordination External Correspondences & Representation with Project Stake Holders & Government Bodies Requirements: Detailed understanding of Power Sector Policies/ Regulations /Orders issued by CERC/ SERCs/ CEA / MOP/ MNRE/ CTU etc. Have […] Read more
New Empanelment Tender for 25 MW Rooftop Solar Projects in Jharkhand Updated On Wed, Apr 14th, 2021 by Saurenergy Jharkhand Bijli Vitran Nigam Limited (JBVNL), the largest electricity distribution company of Jharkhand State, has issued a new tender, inviting e-bids from eligible agencies to get empaneled to supply, install, and commission 25 MW of residential rooftop solar power projects under the MNRE Phase-II Scheme. These solar projects will be developed under the Renewable Energy […] Read more