NTPC REL Floats Tender for BOS Package of 1200 MW Wind Projects Updated On Mon, Nov 20th, 2023 by Saurenergy The renewable energy arm of India’s largest energy conglomerate NTPC, NTPC REL has floated a tender for the BOS package of ISTS-connected wind energy projects of nominal capacity of 1200 MW with greenshoe option of upto 300 MW at Anantapur in Andhra Pradesh. The last date for receipt of bids comprising both techno-commercial bid and […] Read more
Govt Amends Bidding Norms To Ease Early Starting Of Wind Projects Updated On Mon, Nov 20th, 2023 by Saurenergy The Ministry of Power recently notified a new resolution to amend the norms for tariff-based bidding process for procurement of wind power from the wind energy generators in the country. The new resolution paved the way for early clean energy production and distribution commencement. Earlier in 2023, the ministry had issued guidelines for tariff-based competitive bidding processes […] Read more
Roofsol Energy to Execute 11.53 MWp Solar Rooftop in Ludhiana Updated On Mon, Nov 20th, 2023 by Saurenergy Mumbai-headquartered firm engaged in providing ground mount and solar rooftop solutions for the commercial & industrial sector, Roofsol Energy Pvt Ltd has been awarded a rooftop solar project at Sharmanji Yarns Pvt Ltd, a spinning mill in Ludhiana, Punjab, for a capacity of 11.53 MWp. The rooftop project will employ high-efficiency N-type 690 Wp modules […] Read more
Top 5 Reasons Why India’s Power Demand Exceeded Projections Updated On Mon, Nov 20th, 2023 by Saurenergy India’s power demand has been rising steadily. The country’s higher than anticipated peak demand has been in the news, with peak demand touching a lifetime high of 223 GW in June 2023 when peak deficit touched 0.17 percent. As per the Load Generation Balance Report (LGBR) released by the Central Electricity Authority, the peak demand […] Read more
THDCIL Solicits Bids for 11 MW Floating Solar Plant Updated On Mon, Nov 20th, 2023 by Saurenergy Miniratna PSU THDC has floated a tender for setting up of grid connected 11 MW (AC) floating solar PV (FSPV) plant on raw water reservoir of Khurja Super Thermal Power Plant. The cost of the tender is pegged at INR 63.56 Crore (including GST). The last date and time of bid is November 20, 2023 […] Read more
Lead Grid Modelling Engineer Updated On Fri, Nov 17th, 2023 by Saurenergy Primary Responsibilities:- Support assessment of BESS solutions to comply with Generator Performance Standards (GPS) for grid connections. Manage grid modelling studies for BESS system grid connections, including model troubleshooting and technical support. Undertake preliminary modelling and assessments (such as Model Acceptance Tests) Management and provision of registration (R1) and commissioning (R2) documents and technical information […] Read more
Wind Turbine Certification Engineer Updated On Fri, Nov 17th, 2023 by Saurenergy We are seeking a candidate to be part of our Onshore Wind Turbine Certification Team, coordinating the work to obtain IEC/IECRE Type Certificate for our wind turbines. Wind Turbine Certification Engineer will coordinate all activities involved in the certification process linked to design, manufacturing and testing, engaging with all involved teams, suppliers and certification bodies. […] Read more
ReNew Commissions First Of 3 ISTS Transmission Projects In Karnataka Updated On Fri, Nov 17th, 2023 by Saurenergy After winning 3 transmission projects in Karnataka to date, ReNew has commissioned the first of those as part of their commitment to build transmission for ~5 GW of wind power, under (Inter State Transmission System) ISTS. Central Transmission Utility (CTU), a Govt. of India owned entity and a wholly owned subsidiary of Power Grid Corporation of […] Read more
Trina Solar Consolidates Australian Market Presence with 1 GW Solar MoU Updated On Fri, Nov 17th, 2023 by Saurenergy Solar panel manufacturer Trina Solar has joined hands by way of a Memorandum of Understanding (MoU) Solar Juice, an Australian solar distributor. The MoU will pave the way or Solar Juice to procure 1 GW of Trina Solar Vertex modules across a span of three years. The China-based firm will further cement its position in […] Read more