Shakti Pumps Receives Empanelment Letter From MSEDCL For 25,000 Pumps Updated On Thu, Dec 12th, 2024 by Saurenergy Indian solar pump manufacturer Shakti Pumps (India) Limited (SPIL) today announced receiving a Letter of Empanelment from the Maharashtra State Electricity Distribution Company Limited (MSEDCL) for 25,000 Standalone Off-Grid solar pumps. This was meant for Solar Photovoltaic Water Pumping Systems (SPWPS) pumps collectively worth Rs. 754.30 Crores (inclusive of GST) for the entire state of […] Read more
Green Stock Dec 12: Adani Green Stock Bounces Back After Rajasthan Project Updated On Thu, Dec 12th, 2024 by Saurenergy After days of struggles, the stocks of Indian renewable energy company Adani Green bounced back today, showing a recovery. The stock today reported a 6.38% jump. This jump in its stock price came to the fore when the firm reported commissioning a 230 MW of solar project in Rajasthan. Madhya Pradesh-based solar pump company Shakti […] Read more
Andhra Pradesh EV Policy Boosts Private Investment In EV Manufacturing Updated On Thu, Dec 12th, 2024 by Saurenergy To transform Andhra Pradesh into an electric vehicle (EV) manufacturing hub, the state recently announced its Andhra Pradesh Sustainable Electric Mobility Policy (2024-29). This policy will be in effect for the next five years, promoting quality infrastructure through private investments, fostering urban mobility growth, and reducing transport-sector emissions to achieve carbon neutrality by 2047. The […] Read more
QC Engineer Updated On Wed, Dec 11th, 2024 by Saurenergy We are urgently seeking QC Engineers to join our team at Naval Dockyard, Mumbai. The QC Engineers will be responsible for ensuring the quality of electrical, instrumentation, or E&TC engineering projects as per specified standards and requirements. Responsibilities:- Conducting quality control inspections and assessments of electrical/instrumentation/E&TC engineering activities. Ensuring compliance with project specifications, codes, and […] Read more
Juniper Green Inks Landmark 1GW Module Order With First Solar Updated On Tue, Dec 10th, 2024 by Saurenergy Juniper Green Energy has inked a landmark agreement with First Solar, Inc. for the procurement and supply of 1 gigawatts (GW) of its advanced Series 7 FT1 cadmium telluride (CdTe) thin film photovoltaic (PV) modules. The Gurgaon -based renewable energy company plans to deploy these modules in the coming financial year for its projects across […] Read more
Specialist Sales – Valves and Pumps Updated On Mon, Dec 9th, 2024 by Saurenergy Responsibilities:- The position is responsible for sales in Western part of India assigned, including identifying and coordinating complex sales opportunities in a professional manner to deliver differentiated value to customers, aligning with company’s capabilities, products and services. Working as an integral team member of both the product groups. The position has to closely collaborate with […] Read more
Airport Solar Report card-12 Airports Switched To Solar In 2024, UP Leads Updated On Mon, Dec 9th, 2024 by Saurenergy The latest data shared by the Minister of State (MoS) in the Ministry of Civil Aviation (MoCA), Murlidhar Mohol in a written reply, said that about 80 airports have switched over to 100% green energy usage since 2014 in India. Besides trailblazer Kochy, it includes Bengaluru and Hubli Airport. Airports viz. Delhi, Mumbai, Hyderabad, and […] Read more
DCS Commissioning Updated On Mon, Dec 9th, 2024 by Saurenergy Responsibilities:- Develop System Design including System Architecture Perform I/O to Controller Assignment Define Software Concepts Develop configuration and test guidelines Define third party interfaces (Modbus, Profibus, OPC etc.) Develop SW library (Logic as well as graphics) Develop project specific SW typical Perform SW Typical Test Design & Develop I/O & base control modules Develop customized […] Read more
NTPC Races To 300 Billion Units in 2024-25 Updated On Mon, Dec 9th, 2024 by Saurenergy NTPC Group has crossed the 300 Billion Units (BU) generation mark in FY 2024-25. It crossed the 300 BU generation mark on December 18, 2023 (FY 2023-24), a full 10 days faster than it did last year. While NTPC has an installed capacity of 76.5 GW, over 29.5 GW of capacity, including 9.6 GW of […] Read more