Ministry of Power Launches Scheme for Procurement of Aggregate Power of 4500 MW Updated On Mon, Nov 28th, 2022 by Saurenergy The Ministry of Power has launched a scheme for procurement of aggregate power of 4500 MW on competitive basis or five years on Finance, Own and Operate (FOO) basis under B (v) of Shakti policy. PFC Consulting Limited (a wholly owned subsidiary of PFC Ltd) has been designated as the nodal agency by the Ministry […] Read more
Hydro Mechanic-Head/Manager/Officer-Pump Updated On Wed, Nov 23rd, 2022 by Saurenergy Managing Hardware Tools & Machinery, engaged in Design, Manufacturing, Fabrication, Erection, Testing. Commissioning & Supplying of Radial Gates, Sluice Gates, Vertical Gates, Stoplog Gates. Penstock, Intake structure, Presser shaft, Trash rake, outlet structure components. Hydro Mechanical Work & Automatic tilting Gates and it’s related components used for regulating water in Dams, Barrage, Pump Storage Projects […] Read more
NTPC Floats Tender for Land, EHV Transmission System for 2 GW Solar Projects Updated On Wed, Nov 23rd, 2022 by Saurenergy NTPC Renewable Energy Ltd has invited online bids from eligible bidders for the land and EHV Transmission system package for the development of ISTS-connected solar PV projects (up to 2 GW) in Rajasthan. The last date for submitting the bid for this NTPC solar power project is December 27, 2022, till 03:00 pm & bids […] Read more
NTPC Invites Bid for 325 MW Solar Modules Supply in Shajapur Solar Park, MP Updated On Mon, Nov 21st, 2022 by Saurenergy NTPC Renewable Energy Ltd has invited online bids for the supply 325 MW solar modules for solar projects situated in the Shajapur district, Madhya Pradesh. Late last year, NTPC had also tendered for consultants to help it with the 325 MW projects in the district. The last date for submitting the bid for this NTPC […] Read more
NTPC Floats BOS Tender With Nominal Capacity of 1GW Wind Energy Project Updated On Mon, Nov 21st, 2022 by Saurenergy National Thermal Power Corporation Limited (NTPC) has floated balance of system (BOS) tender package of an ISTS-connected wind energy project with a nominal capacity of 1000 MW anywhere in Karnataka. The last date for submitting the bid of this NTPC BOS tender is December 19, 2022, till 03:00 pm and the bid will be opened […] Read more
RUMSL Floats Consultancy Tender for Morena Hybrid Project Updated On Wed, Nov 16th, 2022 by Saurenergy Rewa Ultra Mega Solar (RUMSL) has floated a consultancy tender for preparing a detailed project report (DPR) to develop the Morena wind-solar hybrid project with energy storage in Madhya Pradesh. RUMSL is a partnership between Madhya Pradesh Urja Vikas Nigam and the Solar Energy Corporation of India (SECI) to build solar parks throughout the state. […] Read more
India’s October 2022 Solar Capacity Addition Drops To 810.3 MW, Wind Additions At 178 MW Updated On Wed, Nov 16th, 2022 by Saurenergy October was not a great month for the Indian RE capacity additions. The overall RE capacity additions in comparison to the previous month declined. In October 2022, India added only 810.37 MW of solar energy and just 177.9 MW of wind energy. In the solar sector, India added less capacity in comparison to the month […] Read more
Vedanta backed Serentica Renewables, Greenko Group In1500 MWhr Industrial Storage Deal Updated On Mon, Nov 14th, 2022 by Saurenergy Vedanta resources backed Serentica Renewables, a decarbonization platform that seeks to accelerate the energy transition for energy-intensive industries, has entered into an agreement with Greenko Group, to source 1500MWhr energy storage capacity through Greenko’s pumped storage projects located in India. As part of this partnership, Serentica will capitalise on Greenko’s energy storage capacity from its […] Read more
Adani Green Q2 Results- Profits Grow 49% As Strong Solar Growth Continues Updated On Fri, Nov 11th, 2022 by Saurenergy Adani Green Energy Limited, the renewable development arm of the Adani group that has set a 45 GW capacity target for 2030, has announced its Q2 FY23 results. Operational capacity has grown to 6724 MW during the quarter. Revenues from power supply jumped 33% over the corresponding quarter in Fy22, going to Rs 1107 crores […] Read more