SUBSCRIBE NEWS LETTER

led

Azure Power Q2 Results. Not Enough To Enthuse Investors

The NYSE listed Azure Power Global Limited announced its consolidated results under United States Generally Accepted Accounting Principles (“GAAP”) for the fiscal second quarter 2022, period ended September 30, 2021. Fiscal Second Quarter 2022 Period ended September 30, 2021 Operating Highlights: Megawatts (“MW”) Operating* were 2,210 MWs, as of September 30, 2021, an increase of 31% over September 30, 2020. […]

Read more

Curbs On China Imports Fail To Slow Down Solar Imports For US In 2021

A research report from Rystad Energy lays bare the failure of US efforts to reduce dependence on Solar Imports, especially by curbing imports from China. According to the report, the US is on track to import a record 27.8 gigawatts (GW) of solar PV panels in 2021 from a range of countries, up from 26.7 […]

Read more

Lead Engineer – FEA

Tower Value Engineering department is responsible for providing optimized tower solution to Vestas tower program. The tasks range from understanding the design requirement and requirement specification, designing tower using analytical and FEM calculations, designing tower components, performing DFMEA, test planning and execution to risk assessments and compilation of certification documentation. Tower value engineering is extension […]

Read more

Component Engineering Project Manager

Drives and guides the creation of a functional architecture for a complete Component and of a technical realization concept over all its domain and technical aspects. Evaluates different concepts with respect to technological and commercial aspects. Specifies and integrates standard products and subcomponents according to the required functionality of the component and coordinates their interfaces […]

Read more

Recruitment of Project Engineer-I -ES Division

 Engineering Services Division of Bharat Electronics Ltd., a Navaratna Company and India’s premier professional electronics company requires the following personnel f or a period of Two years (extendable for maximum of two more years based on project requirement & performance of the individual) for execution of various prestigious projects.     Post     Qualification […]

Read more

MoP Approves 23 New ISTS Projects Worth ₹15,893 cr

The Ministry of Power (MoP) and the Ministry of New and Renewable Energy (MNRE) has approved 23 new Inter State Transmission System (ISTS) projects with an estimated cost of Rs 15,893 crore. The new ISTS projects comprise 13 projects with an estimated cost of Rs 14,766 to be developed under Tariff Based Competitive Bidding (TBCB) […]

Read more

Recruitment of Senior Engineers (E-III) on fixed tenure basis-Es Division

  Engineering Services Division of Bharat Electronics Ltd., a Navaratna Company and  India’s  premier  Professional  Electronics  Company  requires  the  followingb personnel  on  short  term  basis  for  a  period  of  Three  years  for  execution  of various prestigious projects. Post Qualification No. of Posts Min. Post Qual. work exp   Upper age limit as on 01.12.2021 Reservation […]

Read more

Engagement of Medical Profeesionals on Temporary Tenure Basis

  For Full time/Part time consultants at Dhanwantri Hospital GAIL Gaon, Dibiyapur, Auraiya Dhanwantri Hospital a hospital run by GAIL (India) Ltd requires following full time /part time consultants purely on contract basis for its fully equipped Hospital at GAIL Gaon Dibiyapur, District Auraiya, Uttar Pradesh. Sl No Name of the Post and Number of […]

Read more

India’s 2030 Climate Targets are ‘achievable’ through Renewables: Says LBNL 2030

There is no doubt that India is in midst of an energy transition, with important social and economic implications depending on the pathways that are chosen. A Lawrence Berkeley National Laboratory (LBNL) study, under the US Department of State evaluated in-depth India’s future power investments. Giving a promising outlook on India’s future power system investments, […]

Read more
      SUBSCRIBE NEWS LETTER
Scroll