Though India’s RE, EV Subsidies More Than Double in FY22, Support Low Vis-a-vis Ambition Updated On Wed, Dec 21st, 2022 by Saurenergy A study entitled ‘Mapping India’s Energy Policy’ a study conducted by IISD has made significant observations about subsidies in the renewable energy and EV sector and the government support extended to these sectors by way of subsidies. The key observations are as follows: Subsidies for fossil fuels on the declining trend, but RE, EV subsidies […] Read more
Solar Blinds / Shades: Don’t Block The View, Just The Sun Updated On Wed, Dec 21st, 2022 by Saurenergy The newest technology that increases the chances of going greener by converting solar energy into electricity is solar blinds, or more specifically, solar panel blinds. These solar blinds are solar panels that have been converted into window sunscreens. As a result, solar blinds have all the benefits of solar panels and even more. Solar blinds […] Read more
Solar Trackers Surge; Poised To Reach 37,196.86 MW Globally by 2031 Updated On Wed, Dec 21st, 2022 by Saurenergy As per a recent report by a US based market research firm, Transparency Market Research (TMR), the global solar trackers market is likely to reach an installed capacity worth 37,196.86 MW in another nine years. In 2020, the annual installed capacity of solar trackers stood at 6998.8 MW. By 2031, the annual installed capacity will peak […] Read more
Punjab Invites Bids for 10 MW Grid Connected Solar Power Plants Tender Updated On Wed, Dec 21st, 2022 by Saurenergy Punjab Energy Development Agency (PEDA) has floated 10 MW grid-connected rooftop or ground-mounted solar power plants under the renewable energy service company (RESCO) model at various locations in the state. The last date for submitting the online bid is January 30, 2023, and the bid will be opened on January 31, 2023. The scope of […] Read more
Global Shipments of Longi’s Hi-MO 5 Modules Exceed 50 GW Updated On Wed, Dec 21st, 2022 by Saurenergy Global solar conglomerate LONGi has announced that, as of mid-December, global shipments of its Hi-MO 5 solar module have exceeded 50 GW. The manufacturer also said that the cumulative shipments are now approaching 100 million panels. The Hi-MO 5, based on 182mm cells, was officially released in June 2020. It offers features such as adaptability […] Read more
Growatt Has New Advanced Battery For Global Energy Storage Applications Updated On Wed, Dec 21st, 2022 by Saurenergy Global distributed energy solution provider, Growatt has announced the release of one-fits-all APX HV Battery which it claims to be a leading innovation in performance, operation, protection and installation. Integrated with the soft-switching parallel connection technology, the new battery solution contributes more energy by eliminating the effect of the energy mismatch between packs. Growatt held […] Read more
Director General Updated On Wed, Dec 21st, 2022 by Saurenergy National Institute of Solar Energy (NISE) is an autonomous institute (registered under Societies Registration Act 1860) under the administrative control of the Ministry of New & Renewable Energy (MNRE). NISE is having its Headquarters at Gurugram (Haryana). The Institute is an apex National R&D Institute in the field of Solar Energy and undertakes activities related […] Read more
Li-ion Battery-Maker NorthVolt Aims to Build World’s Greenest Battery Cell Updated On Wed, Dec 21st, 2022 by Saurenergy Northvolt is a Sweden-based startup which develops sustainable lithium-ion batteries in conjunction with R&D, industrialisation, and recycling to support clean energy. The Li-ion battery maker was founded in 2016, with a mission to build the greenest battery in the world. The firm provides electrification and renewable energy storage designed for lithium-ion battery plants to produce […] Read more
Electro-Mechanical Design Engineer – Power Quality Solutions Updated On Tue, Dec 20th, 2022 by Saurenergy Responsibilities:- Preparation of PQS Plant Layout (Yard Arrangement – Layout & Plan, Electrical HV / EHV Clearance Check) Preparation of Civil Task (Civil input) Drawings (Foundation, Conduit, Trench, and other civil Requirements) Preparation of Civil Conceptual Design Preparation of PQS Control Building Layout (Electrical Cubicles, Thyristors, Pump skid Arrangement) Preparation of Cable Trench & Conduit […] Read more