Okaya EV Joins Forces with Bluwheelz for 1000 EV Deployment Updated On Tue, Sep 12th, 2023 by Saurenergy Okaya EV, a firm which delves in electric vehicle (EV) industry, has entered into a strategic partnership with Bluwheelz, a tech-enabled logistics firm, known for first-mile, mid-mile, and last-mile logistics solutions and offers Fleet as a Service. The two firms will look at deploying 1000 EVs by September 2023. The initiative will kick off in […] Read more
Powergrid Emerges Successful Bidder for ISTS Project in Rajasthan Updated On Tue, Sep 12th, 2023 by Saurenergy India’s largest electricity transmission company Power Grid Corporation of India Limited (Powergrid) has successfully bagged a project under the tariff-based competitive bidding (TBCB) process to set up an Inter-State Transmission System Project titled, “Transmission system for evacuation of power from REZ in Rajasthan (20 GW) under Phase-III Part C1” on a Build, Own Operate, and […] Read more
KREDL Issues Tender for Consultancy Services for 500 MW Solar Park Updated On Tue, Sep 12th, 2023 by Saurenergy Karnataka Renewable Energy Development Limited (KREDL) intends to develop a solar park of 500 MW AC in Aurad taluk, Bidar District, Karnataka under ISTS mode and requires consultant services for the same. The Central Electricity Authority (CEA) has finalized the location in Malegaon village of Aurad Taluk for establishing 765/400/220kV Bidar Pooling Station. The last […] Read more
CERC Refrains From Penalizing Southern States For Power Over Drawl Updated On Tue, Sep 12th, 2023 by Saurenergy The Central Electricity Regulatory Commission (CERC), in its latest judgment, has warned the southern Indian states against ignoring the warnings from the regional load despatch centers. The Commission, however, refrained from levying penalties on the state utilities for the same. The case came to the fore when the Southern Regional Load Despatch Centre (SRLDC) moved the […] Read more
Djibouti Launches Maiden Wind Farm with 60 MW Capacity Updated On Tue, Sep 12th, 2023 by Saurenergy Djibouti, located on the Horn of Africa, has launched its maiden wind farm- the 60 MW Red Sea Power (RSP) project. This is the key international investment in Djibouti’s energy. The project, valued at US$122 million, has put in place Djobouti’s first Independent Power Producer (IPP). The investors responsible for the said project are mulling […] Read more
PM KUSUM: MNRE Extends Waiver On Local Content Mandate For Solar Cells Updated On Tue, Sep 12th, 2023 by Saurenergy In its latest notification, the Ministry of New and Renewable Energy (MNRE) has extended the waiver of the Domestic Content Requirement (DCR) for solar cells under the Component C of the PM-KUSUM scheme. Earlier, the ministry had issued an official memorandum on August 1, 2022, to extend the waiver till July 20, 2023. In its latest […] Read more
Engineer – Plant Layout Updated On Mon, Sep 11th, 2023 by Saurenergy Well versed with Piping & Layout in Hydro Power Plant Engineering Active participation in basic design and detail design activities. Allotted work to be performed in defined schedule and budgeted manhours Hands on working knowledge in E3D/Revit/ACAD tools and Navisworks Knowledge of Multi-disciplinary design workflows and understanding of 3D co-ordination process. Functional reporting to your […] Read more
Engineer – Generator Auxiliaries Electrical Updated On Mon, Sep 11th, 2023 by Saurenergy To understand the specification of the project, product, customer requirement, Generator operating parameters and operating sequences of Hydro power plant Design / Specification of Generator Instrumentation – for measuring temperature, pressure, flow, Cabling and Terminal boxes, Grounding system, Condition monitoring equipment like Partial discharge, Air gap monitoring, Vibration, Shaft current and Fire protection systems Prepare […] Read more
CERC Proposes Change In Norms Regulating Old Thermal Plants Updated On Mon, Sep 11th, 2023 by Saurenergy The Central Electricity Regulatory Commission (CERC), in its latest notification, has proposed a change in a provision of its existing regulations. This provision is related to the older thermal power plants and their powers to tie up with beneficiaries for power supply. It has asked the stakeholders and public to send in their comments and objections by […] Read more