MNRE Releases New Insurance Product List Covered Under IRDAI Updated On Tue, Feb 27th, 2024 by Saurenergy The Ministry of New and Renewable Energy (MNRE) recently released a list of products that are covered by the IRDAI (Insurance Regulatory and Development Authority of India). The MNRE list covered details of various products that they offered and covered details of risks associated with solar power plants for information to the stakeholders. The list […] Read more
DCS Retrofit Engineer Updated On Tue, Feb 27th, 2024 by Saurenergy Responsibilities:- Site walk-downs for data collection and I/O database preparation, database partitioning from Third Party DCS / PLC systems Design and implementation of power plant controls and protection Systems Process simulation & testing Design Review Meeting (DRM), Pre-FAT, Factory Acceptance Test (FAT) & clean-up after FAT Verification and functional testing of I/O interfaces to field […] Read more
NTPC Invites Bid for 26 MW Floating Solar Plant At Sipat Facility Updated On Tue, Feb 27th, 2024 by Saurenergy NTPC has issued a tender inviting bids 26 MW floating solar project at the reservoir of NTPC Sipat. The bidding will take place in a single stage two envelop process including a techno-commercial bid and price bide followed by reverse auction. The last date for submitting the bid is 28 March and the bid will […] Read more
Senior Engineer-Simulation Updated On Tue, Feb 27th, 2024 by Saurenergy Responsibilities:- You should be able to sub-lead Digital Twin projects. Modeling, testing & tuning of assigned systems/sub-systems within agreed Project budget & schedule Prepare, review & submit the Data Collection List as per Project scope to Project Lead. Prepare, review & submit Functional Design Specification (FDS) to Project Lead Review Marked-up P&ID’s as per the […] Read more
Vestas Secures 153 MW Wind Energy Order In US Updated On Tue, Feb 27th, 2024 by Saurenergy Renewable energy company Vestas received a 153 MW order to power an undisclosed wind project in the USA. The order consists of 34 V150-4.5 MW wind turbines. The orders include supply, delivery, and commissioning of the turbines, as well as a multi-year Active Output Management 5000 (AOM 5000) service agreement, designed to ensure optimized performance […] Read more
Team Leader- Electrical & Instrumentation Updated On Tue, Feb 27th, 2024 by Saurenergy At least 12 years of experience with BE or B.Tech in electrical / Instrumentation and shall be having the following experience: Designing and estimation of power, control and instrumentation systems for Engine/ Motor driven compressors in safe & hazardous areas for various gases applications like Air, Nitrogen, LNG, CNG gas, Biogas application packages etc. Pre/Post-bid […] Read more
Head-Supply Chain -Retail Engineering Updated On Tue, Feb 27th, 2024 by Saurenergy Support procurement for Vendor development for retail engineering Supply Items. Developing,reviewing,renewing specifications for Retail engineering supply items. Developing SOPs, Policies & Guidelines related to Retail Engineering Activities. Helping procurement for negotiations,rate builtup. Cost Optimisation New Ideas & implementation. Standardising Materials, machineries and Equipments Coordinating with vendors,zones and ensuring timely dispatches. Ensuring proactive action for filed […] Read more
Power Systems Engineer Updated On Tue, Feb 27th, 2024 by Saurenergy Responsibilities:- Project Management in Power system studies on Renewable energy (onshore and offshore wind, solar) grid integration. Experience in Load flow studies, system loss calculations, short circuit study, transient & dynamic stability study, voltage stability study, performing short circuit, arc flash, and voltage drop study. Experience with power system simulation packages such as PSS/E, ETAP, […] Read more
JSW Receives LOA For 700 MW ISTS-Connected Project From SJVN Updated On Tue, Feb 27th, 2024 by Saurenergy JSW Neo Energy Limited, a wholly owned subsidiary of JSW Energy Limited, has received Letter of Award (LoA) for ISTS-connected solar capacity of 700 MW from SJVN Limited, against Tariff based Competitive Bid (TBCB) invited for setting up of 1,500 MW ISTS-connected solar power projects. Following the award of 700 MW capacity from SJVN Ltd, […] Read more