QUERIES OF PRE-BID MEETING : SELECTION OF SOLAR POWER DEVELOPERS FOR SETTING UP OF 150MW (50MW X 3) GRID CONNECTED FLOATING SOLAR POWER PROJECTS TO BE INSTALLED AT RIHAND DAM, UP Updated On Tue, May 15th, 2018 by Saurenergy This has reference to the RfS No. SECI/C&P/SPD/RfS/150MW FLOATING/UP/032018 dated 17.04.2018 regarding “Selection of Solar Power Developers for Setting up of 150MW (50MW x 3) Grid Connected Floating Solar Power Projects to be installed at Rihand Dam (also known as Govind Ballabh Pant Sagar Reservoir), Sonbhadra District, Uttar Pradesh”. The pre-bid meeting for the subject […] Read more
Installed Renewable Energy Capacity Nearly Doubled Since 2014, says Govt Updated On Mon, May 14th, 2018 by Saurenergy With 70 GW installed renewable power capacity, renewable energy has a share of over 20 percent of the total installed capacity in the country, it further added. In a major boost to cleaner and greener planet, the total renewable energy installed capacity of the country has risen significantly in just four years i.e. from 36 […] Read more
REAP Completes LED Lighting Contract in California Updated On Mon, Apr 30th, 2018 by Saurenergy The LED lighting featured directional control designed and manufactured by RBNW subsidiary, LED Lites USA, which eliminates scattered glare, providing outdoor areas with pleasing light while making the areas safer for residents. LED lighting solutions provider, Renewable Energy and Power (REAP) has completed its energy efficient LED lighting contract in Stargell Commons in Alameda, California. The LED […] Read more
500MW Solar Auction Cancelled in Gujarat Over Costly Bids Updated On Thu, Apr 19th, 2018 by Saurenergy The successful bidders include Kalathia Engineering and Construction, Gujarat State Electricity Corporation Limited (GSECL), ACME Solar Holdings and Azure Power. Auction conducted on March 28 for 500 MW has been cancelled by the state owned utility Gujarat Urja Vikas Nigam Limited (GUVNL). The tariffs quoted by the bidders, considered to be too high, is the […] Read more
POSTPONEMENT OF THE TENDER UPLOADING : SELECTION OF SOLAR POWER DEVELOPERS FOR SETTING UP OF 100MW (50MW X 2) GRID CONNECTED FLOATING SOLAR POWER PROJECTS TO BE INSTALLED AT RIHAND DAM, UP Updated On Fri, Apr 13th, 2018 by Saurenergy This has reference to the NIT No. SECI/C&P/SPD/RfS/100MW FLOATING/UP/032018 published dated 16.03.2018 regarding the RfS Selection of Solar Power Developers for Setting up of 100MW (50MW x 2) Grid Connected Floating Solar Power Projects to be installed at Rihand Dam (also known as Govind Ballabh Pant Sagar Reservoir), Sonbhadra District, Uttar Pradesh. The RfS documents […] Read more
Larson Electronics Releases 30 Foot 100-Watt Solar Powered LED Light Tower Updated On Fri, Mar 30th, 2018 by Saurenergy The SPLT-.53K-LM30-2XWP500-TLR7 from Larson Electronics is a portable, solar powered LED light tower. This powerful lighting system is equipped with two 265-watt solar panels, two 50-watt LED fixtures and two 12V 250aH 8D batteries. Larson Electronics released a solar powered LED light tower system that features two 265-watt solar panels providing 350-amp hours of usable […] Read more
India will Achieve Installed RE Capacity Target Before 2022: MNRE Secy Updated On Fri, Feb 23rd, 2018 by Saurenergy International Solar Alliance (ISA) will help mobilise sufficient funds for solar energy projects. The Ministry of New and Renewable Energy (MNRE), Secretary, Anand Kumar said that India would achieve its target of installed renewable energy capacity of 175 GW well before 2022 for which bidding process would be completed on time. Anand Kumar while speaking […] Read more
Seraphim Supplies Eclipse For China’s First 5 MW PV Plant with Shingled-Cell Modules Updated On Mon, Jan 29th, 2018 by Saurenergy The Seraphim Eclipse high-efficiency module selected for this project is widely recognized in the solar industry for its innovation and value. The first ground-mounted solar plant using shingled-cell modules, also known as the Zhaiheyuan Project, was successfully connected to the grid in China’s Henan Province. At 5 MW, the Zhaiheyuan Project is also the biggest […] Read more
Solar Lights to be installed at Koyambedu Staff Quarter Premises Updated On Tue, Jan 16th, 2018 by Saurenergy According to officials, a total of 35 such lights will be installed with a lithium-ion battery backup within a period of six months, once the contractor is chosen. Chennai Metro rail will be installing solar street lights at their staff quarter premises at Koyambedu in an effort to maximise the use of renewable energy. It […] Read more