DhaSh PV Prepares For Next Stage OF Growth With 50 GW Manufacturing Expansion Updated On Tue, Jul 2nd, 2024 by Saurenergy Bengaluru-based DhaSh PV Technologies Limited, India’s largest Integrated PV Junction Box Manufacturer, has broken ground on its ambitious INR 346.35 crore investment project in the Sira Industrial Area, Tumkur, Karnataka. Spread over an area of almost 20 acres, this project is the biggest expansion from the integrated PV equipment supplier. A state-of-the-art manufacturing plant dedicated […] Read more
NSEFI, BSW Collaborate For Delhi’s First PV-Powered EV Charging Station Updated On Tue, Jul 2nd, 2024 by Saurenergy The National Solar Energy Federation of India (NSEFI), India’s leading solar policy advocacy body unveiled Delhi’s first grid-connected solar-powered EV charging station at Hauz Khas Village Parking Station. The solar-powered EV charging station was inaugurated by the German Ambassador to India and Bhutan, Philipp Ackermann. The formal inauguration was done on 26th June 2024 in the […] Read more
PEM Civil PV Solar Updated On Mon, Jul 1st, 2024 by Saurenergy The person shall be responsible for the complete design and detailed engineering for Solar Power plants in Gigawatt scale. The PEM shall manage the entire design for a project or a set of projects as assigned including co-ordination with other disciplines viz., Electrical, instrumentation and Mechanical PEM shall lead a team of Lead Engineers, Design […] Read more
Assistant Manager Channel Sales Updated On Mon, Jul 1st, 2024 by Saurenergy The position is responsible for efficiently and effectively managing partners and ensuring increase in the walk-ins numbers, order booking and increase in sales revenue targets, unit sales and collections (within given budget and timelines) for the assigned project/s. Key Accountabilities:- Sales Value (Rs. Cr) and Volume achievement (Units) as per target. (Sales = Net Order Book) […] Read more
Avaada Energy Secures 820 MWp-Hybrid Project From SJVN Updated On Mon, Jul 1st, 2024 by Saurenergy Mumbai-based Avaada Energy, a subsidiary of Avaada Group secured an 820 MWp Hybrid-Inter-State Transmission System (ISTS) capacity in the recent e-Reverse Auction (e-RA) held in June 2024. This project was awarded by SJVN Limited, as confirmed in the Letter of Award (LoA). Vineet Mittal, Chairman of Avaada Group, stated, “Securing 820 MWp-hybrid-ISTS capacity is a […] Read more
Waaree Receives 900 MW Order From Serentica For Project In Rajasthan Updated On Mon, Jul 1st, 2024 by Saurenergy Mumbai-based Waaree Energies Ltd., India’s largest solar PV modules manufacturer with an aggregate installed capacity of 12 GW as of June 30, 2023 has received a 900 MW module supply deal from Serentica Renewables India Private Limited. Waaree Energies received this contract for a project located in Fatehgarh, Jaisalmer, Rajasthan, India. This project is expected […] Read more
Lead Designer-Panel and Switchboard Updated On Mon, Jul 1st, 2024 by Saurenergy Lead Designer will be responsible for interpreting detailed non-standard switchboard product customer requirements and translating them into the final design package for the shop floor for smoother manufacturing of customized switchboard as a product. Contact field sales and/or the end customer or Consulting Engineer as required to ensure accurate interpretation of the intent of the […] Read more
Sr. Ecodesign Engineer Updated On Mon, Jul 1st, 2024 by Saurenergy If you desire to be part of something special, to be part of a winning team, to be part of a fun team – winning is fun. We are looking forward to hire Sr. Ecodesign Engineer in Pune, India. In Eaton, making our work exciting, engaging, meaningful; ensuring safety, health, wellness; and being a model of inclusion & diversity are already […] Read more
SECI Invites Bids To Select Developers For 400 MW Hybrid Projects Updated On Mon, Jul 1st, 2024 by Saurenergy The Solar Energy Corporation of India (SECI) has now invited proposals for setting up Inter-State Transmission System (ISTS)-connected hybrid power projects in India, on a build-own-operate (BOO) model for an aggregate capacity of 400 MW. The tender invited bids for the inter-state transmission system (ISTS-connected) wind-solar hybrid power projects in India under SECI-Tranche-IX. The last […] Read more