SJVN and IREDA Agree Terms for Cooperation on Green Energy Projects Updated On Tue, Dec 8th, 2020 by Saurenergy SJVN Ltd and the Indian Renewable Energy Development Agency (IREDA) have entered an MoU for collaboration on green energy projects. Two Public Sector Undertakings under the Ministry of Power, SJVN Ltd and the Indian Renewable Energy Development Agency (IREDA) have announced that they have entered a Memorandum of Understanding (MoU) for collaboration on green energy […] Read more
Microsun Announces Completion of Solar Plant at 18,000 Feet For ITBP Updated On Tue, Dec 8th, 2020 by Saurenergy Microsun Solar tech Private Limited has announced the completion of some key solar projects it has made for the Indo Tibetan Border Police, (ITBP), a key border force for the Indo-China border. The Indian army thus continues to build on its plans to use solar power more actively for its energy needs. With these projects, […] Read more
Andhra Pradesh Continues On Solo Drive, With Invite For 6.4 GW Solar Bids Updated On Tue, Dec 8th, 2020 by Saurenergy Bids for 6.4 GW of solar projects have been called by the state agency, APGECL, for plants to come up at 10 locations across Andhra Pradesh Bids for 6.4 GW of solar projects have been called for by the state agency, the Andhra Pradesh Green Energy Corporation Limited (APGECL). These plants are supposed to come […] Read more
CERC Lockdown Extended to Jan 20, 2021 By Peeved Supreme Court Updated On Tue, Dec 8th, 2020 by Saurenergy At the latest hearing of the saga around the shutdown of the Central Electricity Regulatory Commission (CERC), the tussle between lawmakers and the law dispensers continued afresh. The Supreme Court, coming down harshly on yet another missed deadline by the government, when it comes to the appointment of an officer of the law as ordered, […] Read more
GE Renewable Energy signs first Cypress order in Spain Updated On Mon, Dec 7th, 2020 by Saurenergy GE Renewable Energy announced today that it has been selected by Azora to supply 19 Cypress onshore wind turbines for the 100 MW Cuevas de Velasco wind farm located in the Cuenca province in Spain. Azora will operate the Cypress turbines at 5.5 MW, with a rotor diameter of 158m, the most powerful ever permitted […] Read more
‘Suns-Voc’ Testing System That Could Become the IoT of Photovoltaics Updated On Mon, Dec 7th, 2020 by Saurenergy A new system ‘Suns-Voc’ developed by a team of researchers from Arizona State University which can measure solar performance over the long term in scalable photovoltaic systems, is being considered as a breakthrough in the cost and longevity of interconnected power delivery. Solar cells are only “current-voltage” tested in the lab before they are deployed […] Read more
Ørsted Divests 25% of 1.1 GW Ocean Wind Offshore Project Updated On Mon, Dec 7th, 2020 by Saurenergy Ørsted has entered into an agreement to sell a 25% ownership interest in its 1,100 MW Ocean Wind offshore wind project to New Jersey’s PSEG. Ørsted has entered into an agreement to sell a 25 percent ownership interest in its 1,100 MW Ocean Wind offshore wind project to New Jersey’s Public Service Enterprise Group (PSEG). […] Read more
Aptera Reveals First Never Charge Solar Electric Vehicle Updated On Mon, Dec 7th, 2020 by Saurenergy Aptera Motors has introduced the first solar electric vehicle that requires no charging for most daily use and boasts a range of 1000 miles per charge. Aptera Motors has announced it has introduced the first solar electric vehicle (sEV) that requires no charging for most daily use and boasts a range of up to 1,000 […] Read more
MNRE Shares Concept Note on Plan for one Solar City in Each State/ UT Updated On Mon, Dec 7th, 2020 by Saurenergy MNRE has shared a concept note per which each State should have at least one solar city where all houses have rooftop solar energy plants and all electricity needs of the city are fully met from solar energy or other renewable energy sources. The Ministry of New and Renewable Energy (MNRE) has shared a concept […] Read more