Tendering Engineer Updated On Wed, May 26th, 2021 by Saurenergy Study of enquiry/ tender received from Sales team /customer. Preparing Synopsis for tender estimated value >5 Crores. Prepare Structural design requisition in case of design-based enquiry / Tender. Prepare list of Pre-bid points or queries for better understanding of tender terms. If e-bidding, then review e-bidding procedure and download necessary documents. In case of e-bidding, […] Read more
Advanced Development Engineer Updated On Wed, May 26th, 2021 by Saurenergy We are looking for a highly skilled product design engineer with knowledge of interdisciplinary engineering fundamentals, who can define and design system level approaches to solve fundamental consumer problems. The candidate has to have highest level of ingenuity and creativity who can work on multiple parallel approaches while solving problems and arrive at the simplest, […] Read more
Say Goodbye To 2020’s Low Solar Bids, As Price Hikes Continue In Modules, Cells Updated On Wed, May 26th, 2021 by Saurenergy The record low prices last seen in GUVNL’s 500 MW auction, when NTPC won with a bid of Rs 1.99/ unit, may be a distant memory as solar equipment prices continue their upward march in 2021. Those low prices in the last big auction of 2020, blamed on NTPC flexing muscle and projections of a […] Read more
Tata Power Solar Systems Bags Rs. 188 Crore EPC Contract From NHPC Updated On Wed, May 26th, 2021 by Saurenergy NHPC, an Indian government hydropower board under the ownership of Ministry of Power, announced yesterday its placement of an order amounting to Rs 188.19 crore with Tata Power Solar Systems Ltd, a Mumbai-headquartered solar energy services provider, to set up a 40 MW solar power project at Ganjam, in Odisha. Tata Power Solar, a wholly-owned […] Read more
Punjab Tender For 5 MW Rooftop Solar Plants on Government Buildings Updated On Wed, May 26th, 2021 by Saurenergy The Punjab Energy Development Agency (PEDA) has released an e-tender for 5 MW of grid-connected rooftop solar PV plants on government buildings anywhere in Chandigarh and the state of Punjab. The scope of work includes Approval of Rates for Design, Engineering, Supply, installation, commissioning, and testing along with the maintenance for 5 coming years of […] Read more
Marketing Executive Updated On Wed, May 26th, 2021 by Saurenergy Developing and executing marketing campaigns. Conducting research and analysing data to identify potential customers. Attending Toll Free number and providing right guidance. Emailing and calling potential customers. Coordinating maintenance of website and looking at data analytics. Updating databases and using a customer relationship management (CRM) system. Coordinating internal marketing and an organisation’s culture. Monitoring performance. […] Read more
IREDA Opens Applications for Solar Module Manufacturing under PLI Updated On Wed, May 26th, 2021 by Saurenergy Indian Renewable Energy Development Agency (IREDA) yesterday invited applications for setting up manufacturing capacities for vertically integrated high-efficiency solar photovoltaic modules under the production-linked incentive (PLI) scheme. The agency will accept applications till June 30, 2021 and it will open bids on 1 July 2021. The PLI scheme, which aims to further domestic manufacturing of high-efficiency […] Read more
1.2 GW Wind Tender With ISTS From SECI. MP To Be Key Power Buyer Updated On Wed, May 26th, 2021 by Saurenergy Large tenders for renewable energy have returned after a short gap, this time with a Wind tender. The Solar Energy Corporation of India (SECI) has issued a tender for setting up of 1,200 MW interstate transmission system (ISTS)-connected wind power projects (Tranche-XI). Projects can be located anywhere in India, although power procured by SECI from […] Read more
Chhattisgarh Invites Bids From Solar Modules Suppliers Updated On Tue, May 25th, 2021 by Saurenergy The Chhattisgarh State Renewable Energy Development Agency (CREDA) has invited bids from the developers or suppliers for standardization of rates for the supply of solar modules of different capacities (75W-315W) for solar application in the state. The modules need to come with ten years onsite warranty conforming to the Bureau of Indian Standards (BIS) and […] Read more