Ather Energy launches Ather Grid 2.0, Its Next Gen Charging Tech Updated On Mon, Nov 1st, 2021 by Saurenergy Ather Energy, India’s first intelligent electric scooter manufacturer, today announced the launch of what it calls the next generation of public fast charging infrastructure, Ather Grid 2.0. The new fast-charging infrastructure builds on the current generation of Ather Grid with enhanced features to support scale and future faster charging capability. The installation of this public […] Read more
Mainstream Renewable Wins 1.27 GW of Renewable Projects In South Africa Auctions Updated On Mon, Nov 1st, 2021 by Saurenergy The consortium led by Mainstream Renewable Power has received 50% of the total allocation in the latest round of the South African Renewable Energy Independent Power Producer Procurement Programme (REIPPPP) Making the formal announcement on October 29, the firm announced that twelve of its projects have achieved preferred bidder status in Round 5 of South […] Read more
MSEDCL Tenders for 1250 MW Of Solar Under State Scheme Updated On Mon, Nov 1st, 2021 by Saurenergy Close on the heels of its tender for vendor empanelment for 200 MW of solar rooftop capacity across the state, the Maharashtra State Electricity Distribution Company Limited (MSEDCL) has invited bids to procure 1,250 MW of solar power from projects developed in various districts of Maharashtra. The bids are under the state’s own Mukhyamantri Saur […] Read more
Proposed Amendment by Power Ministry To Power Corporate and Industrial RE Development Updated On Mon, Nov 1st, 2021 by Saurenergy With 4 stakeholder consultations already held, the proposal by the power ministry to amend the Energy Conservation Act, 2001 is moving ahead. The amendments will have the twin objectives of enhancing demand for renewable energy at the end- use sectors such as Industry, buildings, transport etc, and also support the climate goals commitments of the […] Read more
Tata Pwr, Tata Steel to Set Up 41MW Solar Plants in Jharkhand & Odisha Updated On Fri, Oct 29th, 2021 by Saurenergy Tata Power and Tata Steel, the two flagship companies of the Tata Group, have come together to develop grid-connected solar plants in Jharkhand and Odisha. The two companies have signed a Power Purchase Agreement (PPA) for a duration of 25 years to set up 41MW solar project, which will be a combination of rooftop, floating […] Read more
Principal System Design Engineer Updated On Fri, Oct 29th, 2021 by Saurenergy Lead, drive and execute design and development of electrical and electronic functions within vehicle dynamics area. The scope is global, strategic, and long term. Have operational responsibility for a component, system, and sub-module delivery Secure competitive and timely system solutions for the application needs Lead concept investigation with teams and take the concept for approval […] Read more
Design to Cost Engineer: Gearbox + Lubrication Systems Updated On Fri, Oct 29th, 2021 by Saurenergy The Design to Cost engineer will be responsible for modeling the cost of drive systems and related products; namely the wind turbine main gearbox, pitch and yaw drives, and their lubrication (cooling) systems. This is also referred to as Should Cost Modeling or Should Costing. This person is responsible for supporting commercial negotiations that are […] Read more
Manufacturing Engineer Updated On Fri, Oct 29th, 2021 by Saurenergy Key Responsibilities:- Develops, implements, and maintains methods, operation sequence and processes in the fabrication of parts, components, sub-assemblies and final assemblies. Interfaces with other engineering functions to coordinate the release of product improvements and/or new products. Launches, releases, approves and implements or issues engineering change requests as required to support design engineering and Operations with […] Read more
MoP Revises Terms of Reference of NCT to Fast-track ISTS Process Updated On Fri, Oct 29th, 2021 by Saurenergy The Ministry of Power (MoP) has revised the terms of reference of National Committee on Transmission (NCT) to fast-track Inter State Transmission System (ISTS) planning and approval process, thereby facilitating renewable energy development and integration in the power system. “As one more step in the series of major reforms being carried out in the power […] Read more