NTPC Ltd Floats Tender for Supply of Power Transformer to Khavda Solar Park Updated On Fri, Dec 16th, 2022 by Saurenergy NTPC Renewable Energy Limited (NTPC REL) has invited online bids from eligible bidders on a Single Stage Two Envelope basis for the supply of power transformer supply package-II (South Block) under the development of 4750 MW NTPC Renewables Khavda RE park, Rann of Kutch, Gujarat. The last date for submitting the bid of this NTPC […] Read more
NTPC Floats Tender for Supply of Battery Energy Storage System at Khavda RE Park Updated On Tue, Nov 29th, 2022 by Saurenergy NTPC Renewable Energy Limited (NTPC REL) has invited online bids from eligible bidders on a Single Stage Two Envelope basis for a battery energy storage system (BESS) for solar PV-based construction power at NTPC Renewables Khavda RE park, Rann of Kutch, Gujarat. The last date for submitting the bid of this NTPC BOS tender is […] Read more
Sterling and Wilson Emerges As L1 Bidder for NTPC Khavda RE Park Order Updated On Tue, Aug 23rd, 2022 by Saurenergy Read more
Sterling and Wilson Emerges As L1 Bidder for NTPC Khavda RE Park Order Updated On Tue, Aug 23rd, 2022 by Saurenergy Leading EPC player Sterling and Wilson Renewable energy has informed the stock exchanges that the company has emerged as the L-1 bidder for the BOS package comprising 4 blocks of the proposed solar PV plant of NTPC Renewable Energy Limited at Khavda RE Power Park, Rann of Kutch, Gujarat with an aggregate capacity of ~ […] Read more
NHPC Connects 300 MW Rajasthan Solar Project Updated On Tue, Apr 1st, 2025 by Saurenergy NHPC has connected the 300 MW Bikaner Solar Power Project, in Rajasthan with ISTS and started injecting 31 MW of power into the grid on March 31, 2025, said the company. NHPC said in a regulatory filing, “The commercial declaration of the part capacity of 100 MW in phases shall be intimated in due course. […] Read more
Adani Green Secures 400 MW UPPCL Solar Project At ₹2.57/kWh Updated On Fri, Mar 28th, 2025 by Saurenergy Adani Green’s subsidiary–Adani Renewable Energy Holding Twelve Limited (AREH12L), recently secured a 400 MW solar project from Uttar Pradesh Power Corporation Limited (UPPCL) at a tariff of ₹2.57/kWh. The company informed its investors in its regulatory filing before the exchanges. It said, “Adani Renewable Energy Holding Twelve Limited (AREH12L), a subsidiary of Adani Green, received […] Read more
K2 Infragen Secures Order To Develop 68 MW Project In Gujarat Updated On Wed, Mar 26th, 2025 by Saurenergy Haryana-based K2 Infragen, an EPC company, has secured a solar EPC project (With the supply of BOS material) contract of 67.61 Mega Watt DC in Gujarat. This solar project is part of a 450 MWp project being developed by Coal India Limited in Khavda, Gujarat. K2 Infragen gets this contract from KPI Green Energy Limited. […] Read more
COVER STORY: India’s Different Path For Solar Module Manufacturing Updated On Fri, Mar 21st, 2025 by Saurenergy On February 17, the Ministry of New and Renewable Energy (MNRE) issued its latest ALMM (Approved List of Models and Manufacturers) list. The issuing of the much-awaited list has been increasing in frequency over the year, as the rate of addition of new firms and module manufacturing capacity picks up pace. From just 26 manufacturers […] Read more
Adani Green Commissions 250 MW Rajasthan Solar Project Updated On Thu, Mar 20th, 2025 by Saurenergy Adani Green Energy Limited (AGEL) has taken another step toward expanding its renewable energy footprint by commissioning a 250 MW solar power project at Bhimsar, Rajasthan, through its subsidiary. In a regulatory filing, the company announced, “Adani Green Energy Twenty-Four Limited’s latest commissioning has pushed AGEL’s total operational renewable energy capacity to 12,841.1 MW.” The […] Read more