Validation Engineer – Tool Design Updated On Fri, Dec 29th, 2023 by Saurenergy Responsibilities:- Responsible for understanding, clarifying and reviewing tooling design specification, design verification & validation, design risk associated in manufacturing value chain Responsible for validation of technical design documentation such 3D CAD, 2D drawings, technical construction file, HSE risks assessment, DFMEA, Design verification procedure/report etc., adherence to relevant legislations. Validate product and process risk in a […] Read more
PLC Engineer Updated On Fri, Dec 29th, 2023 by Saurenergy Responsibilities:- The primary responsibility of this position is to carry out the detailed engineering of the SCADA-PPC system, OFC Network, SCADA & PPC installations, and configuration Creation and review of Technical Requirement Specifications, Design Descriptions Design and Troubleshoot the Network issue remotely and on-site Creation and review of Test & Verification Procedures and Reports Performs […] Read more
Jindal Stainless Estimates To Generate 1.9 Billion Units Of Clean Energy Annually Updated On Fri, Dec 29th, 2023 by Saurenergy Jindal Stainless, a stainless-steel manufacturer is estimated to generate over 1.9 billion units of clean electricity annually through its wind-solar hybrid, floating and roof-top solar plants, according to its newly released Sustainability Report. The initiatives are estimated to reduce carbon emissions by over 13.52 lakh tones per annum. The company has already partnered with ReNew […] Read more
Solar Inverter Manufacturer Growatt Reflects on Success Stories in 2023 Updated On Thu, Dec 28th, 2023 by Saurenergy Solar inverter manufacturer Growatt has cemented its global reputation as a residential inverter supplier. The firm is also making progress in C&I and large-scale PV plants, strengthening its position among the world’s top four PV inverter suppliers. Here is a recapitulation of the year 2023 that saw Growatt won several laurels… Awards Growatt received multiple […] Read more
MNRE Approved Bihar’s Proposal Under PM KUSUM (Comp-C): Minister Updated On Thu, Dec 28th, 2023 by Saurenergy The Ministry of New and Renewable Energy (MNRE) in its latest reply before the Parliament said that the ministry approved the proposal of Bihar under Component C of the PM-KUSUM scheme. MNRE Minister RK Singh in his written statement before the Lok Sabha said that the state had moved an application to the Centre seeking […] Read more
SUCRL Seeks Land Aggregators for Solar Park of 700 MW Capacity Updated On Thu, Dec 28th, 2023 by Saurenergy SUCRL (Saurya Urja Company of Rajasthan Limited) has issued a tender for the development of a 700 MW solar park on private lease land in any of the location of the four districts, that is, Bikaner, Barmer, Jaisalmer and Phalodi and in the vicinity area of upcoming ISTS grid substation. The last day for the […] Read more
2023 Proved Brightest For Wind Power Generation In India: Govt Updated On Wed, Dec 27th, 2023 by Saurenergy Union Minister R.K Singh in a written reply before the parliament shared data on the contribution of wind energy in the total energy mix in the last three years. The data revealed an incremental growth in the wind generation capacity to the overall renewable energy. The data said that 2023 proved fruitful for the wind […] Read more
Micro-climate Engineer Junior/Intermediate Updated On Wed, Dec 27th, 2023 by Saurenergy Working closely with experienced and senior staff, your project work will involve assessing the impact of wind on human safety and comfort in relation to the design of new buildings. Analysing the structural response of buildings in a complex wind environment and providing guidance to structural engineers. Analysing the cladding pressures on a building façade, […] Read more
Sustainment Project Manager Updated On Wed, Dec 27th, 2023 by Saurenergy PSP engineer responsible for coating equipment over their entire lifecycle, including documentation. Keep the bill of material (BOM) and documentation of coating equipment up-to-date Planning (strategic and operative) and realisation of PSP projects, while taking budget, cost and timeline into account. Duties & Responsibilities:- 1. Product Sustainment:- Responsibility of coating equipment over their entire lifecycle, […] Read more