The Australia Experience: How Energy Storage is Transforming National Grids Updated On Mon, Sep 30th, 2024 by Saurenergy Energy storage has undeniably emerged as a critical component in the growth of solar energy. For much of the last decade, high installation costs and the intermittent nature of renewable energy sources were major barriers to wider adoption. However, advancements in technology and government subsidies have significantly reduced these costs, with increased competition and production […] Read more
Principal Electrical Engineer – Primary Updated On Fri, Sep 27th, 2024 by Saurenergy Responsibilities:- Ability to lead the Primary Design (Concept, FEED , Detail Design) for AIS/GIS/Hybrid Substations upto 400kV – for Utility Companies /Developers, based on international standards – for, UK, Europe, Middle East , South East Asia or Australia regions. Experience in Design of HV/LV Distribution systems for Oil & Gas Sector , offshore Substation, Thermal […] Read more
Senior Electrical Engineer (Primary) Updated On Fri, Sep 27th, 2024 by Saurenergy Principal Duties and Responsibilities: Design (Concept, FEED and Detail Design) of Transmission and Distribution Systems upto 400kV – for Utility Companies based on International standards – for US, UK, Europe, Middle East and South East Asia regions. Experience in Design of HV/LV Distribution systems for Oil & Gas Sector , WIND,BESS projects will be an […] Read more
Senvion Gets 210 MW Order For Its 4 MW Wind Turbines Updated On Fri, Sep 27th, 2024 by Saurenergy Wind turbine maker Senvion India today announced a new order (conditional) from Continuum Green Energy for 50 of its recently launched 4.2M160 wind turbine generators (WTGs), totalling 210 MW. The project is scheduled for deployment in Gujarat or Karnataka, with deliveries beginning in April 2026. In addition to the initial 50 WTGs, the agreement allows […] Read more
GERC Reaffirms Right Of Developers To Replace Damaged Modules Updated On Fri, Sep 27th, 2024 by Saurenergy The Gujarat Electricity Regulatory Commission (GERC) in its latest order said that the solar generators are entitled to replace their older damaged solar panels with new modules by abiding with the committed CUF (Capacity Utilisation Factor). The order of the state power regulator came to the light while hearing a petition of solar power generator […] Read more
MAHAPREIT and NTPC Sign RE Projects Worth 10 GW Updated On Fri, Sep 27th, 2024 by Saurenergy NTPC Green Energy Ltd (NGEL) is a wholly owned subsidiary of NTPC Ltd, under which a joint venture agreement was signed with Mahatma Phule Renewable Energy and Infrastructure Technology, MAHAPREIT. Together, the two firms are set to develop 10 GW of renewable energy parks and projects in the state of Maharashtra or other states in […] Read more
WTO Establishes Panel To Ascertain Tax Credits Rule Under IRA Updated On Thu, Sep 26th, 2024 by Saurenergy The World Trade Organization’s (WTO) Dispute Settlement Body (DSB) at a recent meeting agreed to a request from China to establish a dispute panel. This panel will rule on the WTO compatibility of certain tax credits under the US Inflation Reduction Act (IRA). The move was expected after China made it clear that it opposed […] Read more
4-Year Project Delay Proves Expensive For Rajasthan Solar Developer Updated On Thu, Sep 26th, 2024 by Saurenergy The Appellate Tribunal For Electricity (APTEL) bench has gone with the views of the Rajasthan Electricity Regulatory Commission (RERC) in a case (appeal no 172 of 2019) involving a solar power developer, Arjun Green Power Pvt Limited against the order of the former. Case Overview: Arjun Green Power Pvt. Ltd., a solar power developer, appealed […] Read more
EDU Manager Traction and Energy SEC Updated On Wed, Sep 25th, 2024 by Saurenergy A Project System Engineer specifies, for a project, one or several System Architecture Areas (SAA) and/or associated sub-system(s) at train level and lead technically the engineering studies to design solutions related to his SAAs which meet the project system requirements allocated to them at train level. He is in charge of performing subsystem/component development activities […] Read more