ABB India inaugurates new state of the art factory, doubles solar inverter manufacturing capacity Updated On Thu, Sep 1st, 2016 by Saurenergy ABB India, the power and automation technology major, inaugurated a new solar inverter manufacturing facility in the city. The facility is set to double the solar inverter manufacturing capacity of the company. The factory was inaugurated by Sanjeev Sharma, CEO and Managing Director, ABB India and Robert Itschner, Global Managing Director for Power Conversion, ABB […] Read more
I Would Praise the Govt for Meticulously Planning and Executing Solar Policy in India: Nalin Sharma , VP Ecoppia Asia Updated On Wed, Aug 31st, 2016 by Saurenergy As utility solar becomes competitive; companies are vigorously undergoing enhancements in efficiency and production. Automated systems and digital adoption is driving every corner of the industrial sector. In strive to automate the traditional and inefficient solar cleaning processes; Ecoppia’s robots are well poised to make a transformative effect in the perverse cleaning solution segment. The […] Read more
Suresh Prabhu to inaugurate 160kWp solar Plant at Pune Railway Station Updated On Wed, Aug 31st, 2016 by Saurenergy Suresh Prabhu, the Indian Railway Minister will be inaugurating a new solar power plant at Pune’s railway station on 2nd September, 2016. The 160kWp solar plant will consist of 510 solar modules and string inverters. It is expected to meet 60% of total daytime power requirements. The plant will be generating about 600-650 units of […] Read more
Orb Energy installed and commissioned a 200kw rooftop solar system in Andhra Pradesh Updated On Tue, Aug 30th, 2016 by Saurenergy Orb Energy has announced that it has successfully installed and commissioned a 200 kilowatt rooftop solar system at TGV Projects and Investments Private Limited, Kurnool, Andhra Pradesh. This is company’s 66th rooftop solar system that has been connected to grid in India. NP Ramesh, the Chief Operating Officer of Orb, said: “Orb is encouraging and […] Read more
Waaree Energies installs solar rooftop panels at Growel’s corporate office in Mumbai Updated On Tue, Aug 23rd, 2016 by Saurenergy Waaree energies have installed solar rooftop panels at Growel’s corporate office located in Growel’s Mall– one of the most popular shopping centers in Kandivali, Mumbai. Waaree notes that that solar panel system has played a significant role in reducing the shopping mall’s carbon footprint – eliminating almost 2, 23, 200 kg of carbon dioxide. The complete […] Read more
Kerala State Electricity Board’s solar panel atop dam gets ready Updated On Sat, Aug 20th, 2016 by Saurenergy Kerala State Electricity Board’s (KSEB) dam-top solar project located on the Banasura Sagar Dam at Padinharethara in Wayanad district is all set for commissioning. Developed with an estimated cost of Rs.4.293 crore, the dam-top solar plant is expected to generate five lakh units of power a year. Installed on the dam-top road at a length […] Read more
SMA taking over complete technical operational management of largest PV farm in Denmark Updated On Fri, Aug 19th, 2016 by Saurenergy SMA Solar Technology AG has announced that it is taking over complete technical operational management of Denmark’s largest PV farm on behalf of WIRCON GmbH. The PV farm near Lerchenborg has been on the utility grid since December 2015, it generates approximately 60 million kWh of electric current per year, which is enough to supply […] Read more
RPO enforcement and REC markets need to be revived and net metering needs to be simplified: Kunal Chandra, head of PROINSO India Updated On Tue, Aug 2nd, 2016 by Saurenergy PROINSO has two divisions; Distribution & Integration and EPM (Engineering, Procurement and Management) for projects. The company offer supply and services to installers, construction companies and clients for utility, commercial and residential projects worldwide. With decade of solar experience, Proinso has 27 offices across 6 continents. Kunal Chandra, head of PROINSO India shares with us […] Read more
Lucknow Collectorate goes solar, installs 135Kw PV plant Updated On Mon, Aug 1st, 2016 by Saurenergy The Lucknow Collectorate on Sunday became the first collectorate in the district to be solar-powered. The solar plant includes 438 panels and four grid-connected solar inverters. This solar grid would produce energy for the next 25 years. The 135Kw solar plant installed at the cost of Rs 98 lakh will provide green power to the entire […] Read more