Design Engineer – SOLAR Updated On Tue, Jul 25th, 2023 by Saurenergy The person shall be able to carry out the design and detailed engineering for Solar Power plants like Mini Grid and Mega watt scales plants ,roof top plants . The Design Lead shall design and review the entire design documents and review drawings for a project or a set of smaller projects including co-ordination with […] Read more
Senior / Lead Engineer – Battery Energy Storage System Updated On Tue, Jul 25th, 2023 by Saurenergy Responsibilities:- Review load profiles and Engineer Battery Energy Storage Systems to meet project goals. Clear understanding on the different parameters for design, selection, and sizing of the batteries as well leveraging the parameters to arrive at the most optimum sizes of the batteries. Should have deep understanding on Battery Energy Storage System design, chemistry selection, […] Read more
Senior Electrical Engineer (EMEA Delivery) Updated On Mon, Jul 24th, 2023 by Saurenergy Development and design of electrical drawings like single line diagrams, schematics and other wiring diagrams for battery storage systems, including MV/HV Responsible for short circuit, load flow and arc flash documentation Responsible for quality control of all deliverables within the scope of Engineering Responsible for electrical equipment specifications, data sheets, purchase requisitions and bid evaluations […] Read more
EESL Forges INR 700 Cr Partnerships at 14th Clean Energy Ministerial Meeting Updated On Mon, Jul 24th, 2023 by Saurenergy Energy Efficiency Services Limited (EESL), a joint venture of Public Sector Undertakings under the Ministry of Power, hosted an event titled “Accelerating India’s Net Zero Transition through Energy Efficiency, Sustainable Cooling & Mobility” during the 14th Clean Energy Ministerial (CEM) meeting in Goa. Stanzin Chosphel, Executive Councillor, Ladakh Autonomous Hill Development Council, Leh; Pradeep Kumar […] Read more
Production Test Engineer Updated On Thu, Jul 20th, 2023 by Saurenergy Solar and Storage Solutions provides reliable, affordable and dispatchable integration of renewable energies. The business unit, part of GE Vernova, works with utilities and developers to create Solar and Storage Solutions power networks, which combine renewable sources, efficient energy storage and software to create a more predictable supply of renewable electrons. Roles and Responsibilities:- The […] Read more
Using the Piecewise Method to Check the PV String Ground Point Updated On Thu, Jul 20th, 2023 by Saurenergy Background As the running time of PV plants increases, the DC line slowly ages, and the waterproof performance of the DC terminal (MC4 terminal) deteriorates. As a result, the insulation impedance of the DC line is too low, or the positive and negative terminals are short circuited to the ground. Either way, major failures may […] Read more
Design Engineer – PV Updated On Mon, Jul 17th, 2023 by Saurenergy The Sr. Design Engineer PV Systems will be based in Hyderabad. Onboarding will be virtual for the time being with occasional socially distanced meetings at a Nextracker office. In this position, you will report to the Manager – Systems & Performance Engineering. You will contribute towards the development of Nextracker`s product portfolio. Watch this video […] Read more
GAIL Solicits Bids for Design of 10 MW Grid Connected Solar Power Plant Updated On Fri, Jul 14th, 2023 by Saurenergy GAIL has issued a tender for the design, engineering, procurement, supply, construction, erection, testing, commissioning, operation and maintenance of 10 MW (AC) solar photovoltaic grid-connected power plant at Vijaipur, Guna, Madhya Pradesh. The last day for submission of bids is July 19, 2023. Bids open on July 20, 2023. The EMD is INR 50.30 lakhs. […] Read more
NTPC Floats Tender for EPC Package of 2×100 MW Solar Projects at GSECL Solar Park Updated On Thu, Jul 13th, 2023 by Saurenergy Energy conglomerate Epc Package For Development Of 2x100mw Grid Connected Solar PV Projects At GSECL Solar Park (Stage 1), Khavda. The last day to submit the bid August 8, 2023. Bid opens on August 8, 2023. The EMD cost is INR 100000000. The tender cost is INR 22500. The scope of work entails design, engineering, […] Read more